My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003858
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0003858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:29:29 PM
Creation date
3/5/2020 4:39:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003858
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.Y <br /> Date _ July 26, 2005 <br /> USA GASOLINE QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No: 65 Address: 2500 West Lodi Avenue, Lodi, California <br /> USA Gasoline Project Supervisor: Charles Miller <br /> Consulting Co./Contact Person: Stratus Environmental, Incl Gowri S. Kowtha, P.E. <br /> Consultant Project No: 2007-0065-01 <br /> Primary Agency/Regulatory ID No: Mr. Harlin Knoll, San Joaquin County Public Health Services 11356 _ <br /> WORK PERFORMED THIS QUARTER(Second 2005): <br /> 1. Stratus measured groundwater elevations and collected groundwater samples from wells MWA <br /> through MW-4, MW-6 through MWA 0, and S-2 on April 7, 2005. Well S-1 was dry. <br /> 2. Stratus visited the site five times to conduct operation and maintenance of the SVE system. The <br /> system is being operated in pulse mode. <br /> 3. Stratus compiled and evaluated groundwater monitoring data. <br /> WORK PROPOSED FOR NEXT QUARTER(Third 2005): <br /> 1. The next sampling event is tentatively scheduled for July 2005. Groundwater samples will be collected <br /> for laboratory analysis from wells MWA through MW-4, MW-6 through MW-10, S-1, and S-2. <br /> 2. Groundwater samples will be analyzed at a state-certified analytical laboratory for total petroleum <br /> hydrocarbons as gasoline (TPHG) by EPA Method SW8015B/DHS LOFT Manual, and for benzene, <br /> toluene, ethylbenzene, total xylenes (BTEX), methyl tertiary butyl ether (MTBE), tertiary amyl methyl <br /> ether (TAME), ethyl tertiary butyl ether (ETBE), di-isopropyl ether (DIPS), tertiary butyl alcohol (TBA), <br /> methanol, and ethanol by EPA Method SW8260B. <br /> 3. Stratus will continue to operate the SVE system in pulse mode. <br /> 4. Stratus will visit the site twice each month to perform routine system operation and maintenance and to <br /> collect compliance samples. <br /> 5. Stratus will prepare and submit a Site Conceptual Model(SCM) report. <br /> Current Phase of Project: Remediation 1 Monitoring <br /> Frequency of Groundwater Sampling: All Wells= Quarterly <br /> Frequency of Groundwater Monitoring: Quarterly <br /> Groundwater Sampling Date: April 7, 2005 <br /> Is Free Product(FP) Present on Site: No <br /> FP Recovered This Quarter: NA <br /> Cumulative FP Recovered to Date: NA <br /> Approximate Depth to Groundwater: 43.85 to 46.18 feet below top of well casing_ <br /> KAUSA Gasoline100651Qtriy120051USA_65_2Q05.DOC 57'KAWS <br />
The URL can be used to link to this page
Your browser does not support the video tag.