My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003858
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0003858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 5:29:29 PM
Creation date
3/5/2020 4:39:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003858
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2004. The 150 cfm Stealth Bobcat SVE system operated at the site for a total of 13,624 hours and <br /> removed approximately 3,467 pounds of TPHG and the carbon adsorption system has operated at the site <br /> for a total of 2,124 hours and removed approximately 33.53 pounds of TPHG. The tabulated summaries <br /> of performance of previously operated SVE systems are included in Appendix D. <br /> SVE System Operation and Maintenance <br /> Due to low influent petroleum hydrocarbon concentrations in the extracted soil vapor stream during the <br /> first quarter 2005, Stratus operated the SVE system in pulse mode during second quarter 2005. <br /> Stratus conducted five site visits during the second quarter 2005 to conduct operation and maintenance of <br /> the SVE system, and to collect compliance samples. During the second quarter 2005, the SVE system <br /> has operated for approximately 830.7 hours. The influent TPHG concentrations fluctuated from 16 mglm3 <br /> at the beginning of the quarter (April 5, 2005) to less than 15 Mg/M3 at the end of second quarter 2005 <br /> (May 11, 2005). The average influent airflow rate to the SVE system was observed at 61.80 cfm at an <br /> average applied vacuum of 22.7 inches of water column. Figure 4 presents change in influent <br /> concentrations of TPHG and the cumulative TPHG mass removed as a result of soil vapor extraction. <br /> During the second quarter 2005, approximately 5.83 pounds of TPHG was extracted and abated by the <br /> SVE system. As of May 11, 2005, a total of 4,095.14 pounds of TPHG has been removed from the <br /> subsurface beneath the site. The SVE system is operating as designed and is in compliance with the <br /> SJVAPCD permit requirements. <br /> ATTACHMENTS: <br /> • Table 1 Groundwater Elevation and Analytical Summary <br /> • Table 2 Groundwater Analytical Results for Oxygenates <br /> • Table 3 Operational Uptime and Flow Rate <br /> • Table 4 Flow Rates and Analytical Results of Air Sample Analysis <br /> • • Table 5 Extraction and Emission Rates <br /> • Figure 1 Site Location Map <br /> • Figure 2 Groundwater Elevation Contour Map (Second Quarter 2005) <br /> • Figure 3 Groundwater Analytical Summary (Second Quarter 2005) <br /> • Figure 4 Cumulative Mass Removed and Concentrations of TPHG Vs Time <br /> • Appendix A Field Data Sheets <br /> • Appendix 8 Sampling and Analysis Procedures <br /> • Appendix C Certified Analytical Reports and Chain-of-Custody Documentation <br /> • Appendix D Performance Summaries for Previous SVE Systems <br /> KAUSA Gasolincl00651Qtriy120051USA_65_2QOS.DQC SIRAW5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.