Laserfiche WebLink
„ <br /> PAGE 2— OF Z <br /> WESTFRNGE0ENGINEERS BORING: MW a <br /> DATE.DRILLED: 2-8-93 <br /> SAMPLE INTERVAL <br /> BORE HOLE LOG `# <br /> V WATER <br /> PROJECT: GEOLOGIST: SURFACE , <br /> USA PETROLEUM CORP. STA. 65 V. BENNETT ELEVATION: <br /> LOCATION: DRILLER: TOTAL DEPTH: <br /> 2500 W. LODI AVE., LODI, CA E. FORSSTROM 60' <br /> DRILLING CONTRACTOR: DEPTH TO CASING: <br /> WOODWARD DRILLING CO. WATER: 55' .2,. <br /># REMARKS: 8” HOLLOW STEM AUGUR POWERED BY MOBILE DRILLING RIG, B-57 <br /> 1 140# DROP HAMMER FOR SAMPLING, HAND AUGURED TO 5' W/ 8" AUGUR. <br /> F- ° o CD <br /> LLW = o <br /> T � 3 o CORE DESORPTION � REMARKS <br /> W 2 M <br /> © (n m CO <br /> Sd: crs-med, prly sorted, no odor,wet <br /> redbrn clasy matrix (SP) Total Depth a <br /> 60' <br /> 60' MWS- 22, own Clay:.lt gry-mottled brn, wet, no odor,, <br /> 60 sols- lean (CL) completed-616193 <br /> 2" GW monitoring <br /> EDGE <br /> _ well <br /> f 1ACK E. <br /> NAPPER <br /> * Na 3037 <br /> 9IFOF CA1.> <br /> • <br /> NOTE: PID CALIBRATED WITH 50 PPM <br /> BENZENE FROM CALIBRATiION GAS 1 <br /> r 3 <br />`. F <br />