Laserfiche WebLink
SECOND QUARTER,1997 <br /> GROUNDWATER MONITORING REPORT <br /> USA STATION#65-LODI <br /> NNE, 1997 <br /> 6.0 PREPARATION OF REPORT <br /> Firm Preparing Report ' <br /> GHH Engineering, Inc <br /> 8084 Old Auburn Road, Suite E <br /> Citrus Heights, California 95610 <br /> Report prepared by: , <br /> This report was prepared by GHH Engineering, Inc Mr Richard J Zipp, Principal Hydrogeologist, <br /> is the qualified person responsible for overseeing this project This report was written by Ms <br /> Kathleen A Waldo, Staff Engineer, and reviewed for technical content byMr Vern A Bennett, <br /> Project Manager, and Mr Zipp ' <br /> The analyses and recommendations submitted in this report are based upon the best available <br /> information obtained from the field investigation, persons knowledgeable about the site, and local , <br /> government agencies This report was prepared to assist USA in the evaluation of the site <br /> Any conclusions or recommendations are based on GHII's expertise and experience with the site <br /> However, regulatory agencies may have additional recommendations after they have reviewed and <br /> evaluated the data <br /> This report has been reviewed by the client and they are responsible for the findings herein If you <br /> have any questions or need additional information please call the undersigned at (916) 723-1776 ' <br /> Thank You, <br /> VAAett <br /> Project Manager RED GEp�0 Snkanth Dasappa Date <br /> 'e La RICHARD Gi USA Gasoline Corporation 1 <br /> � y c� <br /> ZIPP <br /> Richard J p, G , H No 275 <br /> Principal Hydrogeolo st CERTIFIED , <br /> HYDROGEOLOGIST <br /> F 15059 51KW1naj\QMR <br /> PC <br /> 6 <br />