Laserfiche WebLink
I <br /> it <br /> l; <br /> { <br /> Dec. 194 Invit, for Bids <br /> J <br /> December 30, 1994 <br /> BID RESPONSE FORM <br /> DEAN'S LUMBER COMPANY <br /> -5-1190 FLORIN PERKINS ROAD, <br /> SACRAMENTO, CALIFORNIA <br /> No. Price <br /> of per <br /> Units Ung Unit Cast <br /> Task l <br /> Background <br /> Investigation Hrs 0 0 0 <br /> Completion of permits Hrs <br /> Price of permits Ea. `�'��' 7,a 7n� <br /> (Dolan's Pays Direct) - K __1 72 <br /> TOTAL $965 .00 <br /> Task 2 <br /> Site Characterization, minimum Drill and Install 4 GW MW' s and <br /> ore vapor extraction vadose well . <br /> Workplan 1 <br /> Monitor Well-shallow vadose 500 50Q <br /> Install (30 feet) <br /> (Driller, s Cost) /fL 1}{3q 53 ] 590 .00 <br /> So-1l Sampling (30 feet) <br /> Oversight (geologist) /=t 1X30 13 .50 405 <br /> Monitor 14ell-ground water <br /> Install (90ft ) <br /> (Driller's Cost) /LL 4X9D 3] 11 , 160 <br /> Soil Sampling (90 ft) <br /> Oversight (geologist) /ft 4X90 9 3240 <br /> Surveying, certified <br /> 4 wells <br /> Final Draftin of 690 Ego - _ <br /> well log, consotructionlogt <br /> and DWR log and report /well 5 <br /> Developi.ng wells /,ae17 a a7.5o 437.50 <br /> Water sampling (Less Lab) /well ?x-20s_Rn <br /> Other direct costs -`4—~� --�-0 !jAQ 10n <br /> slug test , amw s /well s 150.00 1200 .00 <br /> (Gaol.,Tec ,&Equip) / <br /> TOTAL $210 ,7 71 .30 <br />