Laserfiche WebLink
1 <br /> Dec. 194 Invit. for Bids <br /> No. Price <br /> of per <br /> Units Units Unit Comet <br /> Task 6 Report Preparation <br /> Problem Assessment <br /> Report-includes <br /> Feasibility study Mrs 40 70 2800 <br /> Corrective Action Plan/Hrs _ 28 70 1950 <br /> Meetings /Hrs �5 70 —3,;a <br /> Publishing Mrs a 40 Ism <br /> R.G. Review/Authorization /HRS 4 110 440 <br /> Markup for Subcontractors 15 % TOTAL $5,7t0 _00 <br /> (Dri.11er and Laboratory .excluded) <br /> GRAND TOTAL $52 ,700 .00 <br /> Company responded WESTERN GEO-ENGINEERS <br /> Authorized by Jack E. Napper <br /> Title PRESIDENT <br /> Date February 13 , 1995 <br /> NOTE - 7hzs proposal is for a Pilot Test utilizing an ICE Unit with propane as a <br /> supplemental fuel. Other systems were evaluated for this site and an ICE <br /> System is most cost efficient. <br /> Carbon with Blower is cost pzntuative (with related costs for change-outs, <br /> manifesting Hazardous Waste, transportation & disposition). <br /> Thermal/Catalytic Oxidation systems would not be pratical for a test - because <br /> of bring2rg in the needed power and fuel. <br /> 40 <br /> 3 <br />