Laserfiche WebLink
• WEST LODI AVENUE <br /> SIDEWALK <br /> • MW-1MW-2 CULVERT <br /> N l (1.34) <br /> ©S-12 I(1.03)1 f? <br /> PA oTN G O ' (0.8a) a <br /> • <br /> I Mw-8 <br /> i I <br /> z O <br /> 1.0 r�lW-3 Q <br /> (1.02)1 <br /> L <br /> 0.8 1 lJ � MW-5 � <br /> (°78) <br /> C <br /> ? 3 <br /> 0.6 MW-6 -' <br /> i <br /> 0.4 - <br /> DRIVEWAY <br /> .4 DRIVEWAY <br /> Y <br /> V <br /> A CY <br /> E <br /> Q <br /> ^ EXPLANATION O'2 �� CULVERT <br /> n w MW-7 O <br /> op g © Groundwater monitoring well (°'74) <br /> z z n Z <br /> V <br /> Groundwater elevation (Ft.-MSL); -' <br /> m � <br /> A m Fj <br /> , measured 3/30/99 = <br /> ~ U <br /> Groundwater elevation contour <br /> 0 <br /> r (Ft.-MSL) <br /> En Approx. direction of groundwater <br /> q flow showing gradient 0 80 160 <br /> m <br /> Not used to construct contours SCALE IN FEET <br /> o mo <br /> z DATE APR. 1999 FIGURE 2 <br /> DwN ICAB USA GASOLINE CORPORATION STATION NO]65 <br /> N o �G�G APS 2500 W. LODI AVENUE <br /> ` ENVIRONMENTAL SOLUTIONS REV LORI, CALIFORNIA <br /> o A DIVISION OF EMCON PROJECT No. GROUNDWATER C4NTQUR MAP <br /> E z 20A41-008.001 FIRST QUARTER 1999 <br />