Laserfiche WebLink
THIRD QUARTER, 1998 <br /> GROUNDWATER MONITORING REPORT <br /> USA STATION#65-LODI <br /> AUGUST,1998 <br /> 7.0 PREPARATION OF REPORT <br /> Firm Preparing Report <br /> GHH Engineering, Inc. <br /> 8084 Old Auburn Road, Suite E <br /> Citrus Heights, California 95610 <br /> Repo rt.Prepared—by.: <br /> This report was prepared by GHH Engineering, Inc. Mr. Richard J. Zipp, Principal Hydrogeologist, <br /> is the qualified person responsible for overseeing this project. This report was written by Ms. <br /> Kathleen A. Waldo, Staff Engineer, and reviewed for technical content by Mr. Vern A. Bennett, <br /> Project Manager, and Mr. Zipp. <br /> The analyses, conclusions and recommendations submitted in this report are based upon the best <br /> available information obtained from the field investigation, persons knowledgeable about the site, and <br /> local government agencies. However, regulatory agencies may have additional recommendations <br /> after they have reviewed and evaluated the data. This report was prepared to assist USA in the . <br /> evaluation of the site. <br /> This report has been reviewed by the client and they are responsible for the findings herein. If you <br /> have any questions or need additional information please call the undersigned at (916) 723-7645. <br /> Thank You, <br /> Vern A. Bennett <br /> Project Manager Srikanth Dasappa Date <br /> tEgER GEp�p USA Gasoline Corporation <br /> RICHARI3 tr . <br /> Richard J. Zipp, R.G., Q z pp <br /> Principal Hydrogeologis -No. 3611 _ <br /> 1P. �Q <br /> FA5059:-l4AKW1naj1Aug98: <br /> 6 <br />