Laserfiche WebLink
-i <br /> WEGE: TABLE 1 <br /> USA GASOLINE CORPORATION <br /> I11 2500 WEST LODI AVENUE <br /> i <br /> LODI, CALIFORNIA <br /> 1 <br /> GROUND WATER INFORMATION & WATER SAMPLE RESULTS <br /> SAMPLE DATE TOP OF DEPTH TO GROUND SAMPLING CERTIFIED TFH BENZENE TOLUENE ETHYL XYLENE <br /> ID SAMPLED CASING WATER 'WATER COMPANY LAB ppm ppb ppb BENZENE ppb <br /> ELEVATION IN FEET ELEVATION (mg/L) (ug/x') (ug/L) ppb (ug/L) <br /> (AMSL) (AMSL) (ug/L) <br /> i <br /> �P <br /> MW5 04/26/94 36.B3 47.81 -10.98 <br /> 1 <br /> MW6 09/10/91 38.06 51.92 -1.3.86 WEGE CHEMTECH <,05 <.3 <.3 <.3 <.9 <br /> MW6 02/06/92 38.06 50.52 -12.46 WEGE MATRIX 0.1 35 <,3 <.3 <.9 <br /> MWG 06/23/92 38.06 53.18 -15.12 WEGE MATRIX <.05 <.3 <.3 <.3 <.9 <br /> MW6 12/10/92 38.06 52.27 -14.21 WEGE MATRIX <.05 <.3 <.3 <.3 <.9 <br /> - MW6 03/31/93 38.06 49.20 -11.14 WEGE MATRIX <.05 <.3 <.3 <.3 <.9 <br /> MW6 07/07/93 38.06 50.88 -12.82 WEGE MATRIX <.OS <.3 <.3 <.3 <,9 <br /> r <br /> MW6 04/13/94 - - WEGE ANLAB 0.029 <.5 0.62 <.5 <.5 <br /> MW6 04/26/94 38.06 49:21 -11.15 <br /> MW7 09/10/91 37.88 51.82 -13.94 WEGE CHEMTECH <.05 <.3 <,3 <.3 <.9 <br /> MW7 02/06/92 37.88 50.79 -12.91 WEGE MATRIX <.05 <;3 <.3 <.3 <,9 <br /> MW7 06/23/92 37.88 53.2 -15.32 WEGE MATRIX <.05 <.3 <.3 <.3 <.9 <br /> MW7 12/16/92 37.88 52.64 -14.76 WEGE MATRIX <.05 <.3 a.3 <.3 <.9 <br /> I+ MW7 03/31/93 37.88 49.22 -11.34 WEGE MATRIX <.05 <.3 <.3 <.3 <.9 <br /> rr <br /> MW7 07/07/93 37.88 50.92 -13.04 <br /> MW7 04/13/54 WEGE ANLAB <.02 c.5 <.5 <.5 <.5 <br /> MW7 04/26/94 37.88 49.14 -11.26 S <br /> MW8 03/31/93 37.64 48.20 -10.56 WEGE MATRIX 0.21 450 30 6 180 } <br /> + MW8 07/07/93 37.64 49.80 -12.16 WEGE MATRIX 0.28 130 c,3 5.6 240 <br /> Y s <br /> MW8 04/13/94 WEGE ANLAS 61 3500 2800 <200 10000 <br /> w <br /> MWB 04/26/94 37.64 47.53 -9.89 <br /> S1 09/10/91 37.58 5 <br /> 51 02/06/92 37.58 r . <br /> S1 06/23/92 37.58 e <br /> S1 12/18/92 37.58 <br /> Si 03/31/93 37.58 <br /> S1 07/07/93 37.58 <br /> r <br /> S2 09/10/91 37.76 <br /> S2 02/06/92 37.76 <br /> S2 06/23/92 37.76 <br /> S2 12/18/92 37.76 <br /> - S2 03/31/93 37.76 1 <br /> i S2 07/07/93 37.76 <br /> WEGE= WESTERN GEO-ENGINEERS <br /> IT <br /> n A , <br />