My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013036
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0013036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 6:11:50 PM
Creation date
3/5/2020 4:58:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013036
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.L <br /> CONTROL EQUIPMENT DESCRIPTION <br /> i Type.of Control [ ] Carbon Canisters [ ] Catalytic Oxidizer [ ] Internal Combustion <br /> (check atl <br /> i Engine (attach detailed <br /> appliicab1e.,boxes} <br /> 'I. [ ] Thermal Oxidizer [ ] Other: specifications) <br /> i <br /> Carbon Canisters Manufacturer: Model: Vent Scrub 1000 <br /> US Filter <br /> ,e. <br /> (2 required �n series) Weight of Primary Canister: 1 ,00 0 1b Weight of Secondary Canister: 1 , 000lb <br /> E=ach canister must be able to withstand 7 days of operation without breakthrough <br /> 'IC Engine Engine Manufacturer: Engine Model: <br /> it <br /> {catalytic converter Type of Supplemental Fuel Used: Rating: <br /> required) [ ] Natural gas [ ]LPG/Propane <br /> BHP <br /> Maximum Gasoline Consumption at Rated Power Output: gal/hr <br /> 71 <br /> Emission Data Pnor to'.catal tic cvnuert'er 02, dry: <br /> ( Y . ) y v <br /> t (If corrected to other than 75% Oz dry tiasis H�nd�cate at rrghtJ % € <br /> Nitrogen Oxides (as NO2) ppmvd <br /> Carbon Monoxide ppmvd <br /> Catalyst Manufacturer: . Catalyst Model: <br /> Guaranteed Catalyst Efficiency % NOx % CO % VOC <br /> ThermallCatalytic Manufacturer: Model: <br /> `Oxidizer , [ ] Natural gas MMBtu/hr [ ] LPG/propane MMBtu/hr [ ] Electric kVA <br /> �. Thermal must have a minimum 1400 OF and Catalytic must have a minimum of 600 OF <br /> I A continuous temperature recording device or an automatic shutdown system is required <br /> ADDITIONAL INFORMATION I <br /> a <br /> Maximum length.of project: One Year <br /> Stackgas temperature after control:" 95-120 OF Stack gas velocity after control, $00 fpm , <br /> Stack height (include units): 3:10 feet. Stack diameter (include units): 2—inches <br /> Does the stack have a rain cap: P] Yes [ ] No <br /> Nearest Receptor Receptor Description Distance from Stack to <br /> Offsite Business' <br /> Sensitive ReceptorZ <br /> 1. Examples of Offsite Business include but are not limited to office buildings,'iguard posts, and factories. <br /> 2. Examples of Sensitive Receptors include but are not limited to schools, day",care centers,.hospitals, apartments <br /> and other places of residence. <br /> 1. Attach a sketch of the equipment configuration. <br /> 2. Operating Schedule: 24 hours per day' 7 days per week 52 weeks per year. <br /> l 3. Attach copies of lab results and equipment data sheets, including speciation profiles. <br /> 4. Completely fill out this form, all information submitted may become permit conditions, <br /> is - . <br />
The URL can be used to link to this page
Your browser does not support the video tag.