My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012557
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
3500 - Local Oversight Program
>
PR0545420
>
ARCHIVED REPORTS_XR0012557
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 7:04:42 PM
Creation date
3/5/2020 5:03:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012557
RECORD_ID
PR0545420
PE
3528
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (SPEEDWAY) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
02
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`D <br /> October 13 1987 <br /> � � AGS 87050-2 <br /> 60 USA Station No. 65, Lodi, California <br /> was relocated to the parking area south of the dispenser islands. <br /> Our revised Work Pian, dated July 10, 1987, incorporated the well <br /> relocations and other information requested by the CVRWQCB. <br /> Applied GeoSystems submitted an application for a permit to drill <br /> the three wells to the San Joaquin Local health District on June <br /> i 8, 1987. The Health District verbally granted approval to drill <br /> on August 4, 3.987, after receiving confirmation from the CVRWQCB <br /> that our .'Work Plan was acceptable. The Health District does not <br /> issue written approvals to drill. <br /> 71ELD WORK <br /> ion of Drilling and-Qxceni,cyalsor_LMMjV8 8 <br /> A geologist from Applied GeoSystems observed drilling of soil' . <br /> ® boreholesand construction of ground-water monitoring wells on <br /> August 11 and 12, 1987. The three. boreholes were drilled.with a <br /> '1 - <br /> CME-75 truck-mounted drill rig operated by:Datum Exploration, <br /> Inc. , of Pittsburg, California. Steam-cleaned, 8-inch-diameter, <br /> continuous flight, hollow-stem augers were used to drill <br /> boreholes B-1, B-2, and B-3 to depths of 62 feet. Ground water. <br /> was initially encountered at depths of approximately 40 to ,48 <br /> ;`. feet in the boreholes during drilling and later was measured .at <br /> b <br /> .4,P,o/ied GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.