My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2850
>
3500 - Local Oversight Program
>
PR0545426
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 11:17:16 AM
Creation date
3/6/2020 10:38:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545426
PE
3528
FACILITY_ID
FA0003857
FACILITY_NAME
DIAMOND TRANSPORTATION LOGISTIC INC
STREET_NUMBER
2850
Direction
E
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17910003
CURRENT_STATUS
02
SITE_LOCATION
2850 E LOOMIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . 2 METHOD SPECIFIC <br /> SAMPLING INSTFZUCTIONS <br /> TO-17 Sampling Instructions <br /> Application: Soil Gas <br /> Media: TO-17 tube, 1/4"Teflon tubing, 1/4"Tygon tubing, 1/4" to 1/4"Union, 1/4"fittings <br /> with ferrules, a sample pump and a low flow holder mayb required if using a higher flow pump <br /> Typical Sampling Parameters: Sample Flow Rate = m <br /> 0mL/min Total Vol. = 200 L Du- <br /> ration = 4 rain. These parameters may change depen ~ g on project objectives. "'" <br /> I <br /> Sam <br /> Ve Flow <br /> Tygon Tubing to Pum} Teflon Tubing'to 861 Gas Probe <br /> 22- - <br /> r4 - - <br /> Sorbent Tube Ring Indicates Sample Inlet Union <br /> I <br /> Instructions: <br /> 1) In order to calibrate the pwnp use a"set=up" tube, sing the Tygon tubing connect the sam- <br /> pling pump to the outlet of the's-066 t tube;if us'ing a higher flow pump a low flow holder <br /> may be necessary to lower the flow rate,then connec the inlet(the ringed side) to the calibra- <br /> tor.Adjust setting to desired flow rate and record. <br /> 2) Replace the "set-up" tube with a sample tube. Again using the Tygon tubing connect the <br /> sampling pump to the outlet of the sample tube. Attach the inlet to the union fitting using a <br /> Swagelok nut. Using a 9/16" wrench on the nut an a 7/16" wrench on the union, tighten <br /> the nut. In the same manner, attach the union to the Swagelok nut on the soil gas probe tub- <br /> ing.DO NOT OVERTIGHTEN. <br /> 3) Start the sample pump and record the start time.A ter the desired duration, stop the pump <br /> and record the end time. <br /> 4) Replace the end plugs on both ends of the sample tabe. Record the sample ID,.tube ID and <br /> the collection date/time on the COC. ` <br /> f <br /> 5) When completed with a set of samples, re-attach the "set-up" tube to the calibrator and <br /> measure the post-sampling flow. Record post-sampling flow rate. This should match within <br /> 10%of the pre-sample flow rate. <br /> 6) Record sample volume on the COC using the averse of the pre- and post- flow rates. <br /> a. � 'x <br /> 7) Send tubes to the lab in the cooler with ice. <br /> rpm's <br /> Za <br /> ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.