My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2850
>
3500 - Local Oversight Program
>
PR0545426
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2020 11:17:16 AM
Creation date
3/6/2020 10:38:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545426
PE
3528
FACILITY_ID
FA0003857
FACILITY_NAME
DIAMOND TRANSPORTATION LOGISTIC INC
STREET_NUMBER
2850
Direction
E
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17910003
CURRENT_STATUS
02
SITE_LOCATION
2850 E LOOMIS RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09 June 2000 <br /> AGE-NC Project No. 98-0407 <br /> Page 8 of,10 <br /> 4.3. WELL DEVELOPMENT <br /> Development will consist of a combination of bailing t remove the major portion of fine-grained <br /> sediment from inside the well, surging to flush out or aw in sediment from the filter pack, and <br /> additional bailing.to finish the removal of sediment. Devi loprrient activities will be continued until <br /> field parameter(pH; electrical conductivity, and temperature) readings have stabilized.' <br /> 4.4. GROUNDWATER SAMPLING PROCEDURE <br /> Groundwater-sample collection will be performed in accoi dance with the PHS-EHD's Recommended <br /> Groundwater Sampling Guidelines; dated 15 February 1995. <br /> 4.4.1. Static Water Level Measurements <br /> Before sampling and during groundwater monitoring, static water level will be measured using an <br /> electric water level.indicator. Water level data will b recorded to the nearest 0.01 foot from a <br /> reference point marked of the top of the PVC well casing. Before and after each use, the <br /> measurement.device will be rinsed with water. <br /> 4.4.2. Well Evacuation <br /> Subsequent to measurerrient of depth to water and prior�o sampling, the'well will be purged using <br /> a submersible pump or a disposable bailer to ensure that the sample is representative of the <br /> formation,rather than water standing in the well casing.I he well will be purged until: 1)a minimum <br /> of three casing volumes is removed from the well; and/or 2) the'field-measured ground water <br /> parameters have stabilized. However, if a well-is purged dry prior to evacuating three casing ' <br /> volumes, a groundwater sample will be collected fo110lving 80 percent recovery of ground water <br /> within the well or within 8 hours of well evacuation. <br /> .4.4.3. Sample Withdrawal. <br /> Watersampleswill be collected.from-the monitoring w li using a disposable polyethylene bailer. <br /> These bailers are disposed of after one use and require nodecontaminating;thereby minimizing cross <br /> contamination due to sampling devices. Samples will be drawn and collected in such a manner that <br /> agitation and exposure of the groundwater to the atmosphere is minimal. Sample containers will be <br /> filled using the appropriate disposable sampling attachm nt which allows controlled flow out of the <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.