Laserfiche WebLink
San Joaquin County <br /> 90'�•�s'�t� <br /> Envi.ronmental ,H Health Department DIRECTOR <br /> Donna HaTan,REHS <br /> 60 !East Main Sheet <br /> £ ` ; Stockton, �C:al fornia:9'S 02-3029 PROGRAM �ur��r��s <br /> ' Robert Mor—hAnn,IRGHS <br /> :def!Camesm,IRIEHS,RDI <br /> 5a+� <br /> Website. vnYw sjgov bad ikasey Foley,REI €S <br /> L i Manila fiUrkatte..RENS <br /> �Pla�an�e: (209)+tS8-3 20 <br /> Fax_ (209)4£4-09 8 <br /> March 21, 201 <br /> Four ft's Parhwsbip <br /> Messrs. lDarniiell IFolcher, QTv iri Srowon, Jeffery Brown, and Sidney Say Wn <br /> 71 West Park Avenue <br /> Vineland, New Jersey 08363 <br /> Subject; National Freight <br /> 2850 Loomis Road <br /> Stockton, CA 95205 <br /> The Sawn Joaquin County Environmental" Health Deparkoilent (EHD) has reviewed Well <br /> Destruction Work Paan, dated 28 February 2012, pr pared by your cons ulting finnn, Advance <br /> GeoEnvirornrnerntall, Inc, (AGE),for ttne above-referenced site_ The vmrl<0-lan was submitted in <br /> response to the EHD letter dated 26 January 2,012directing the slut wittal df a Scope ®f W&k <br /> proposal to destroy the six we9is at this site. <br /> In the Worlk plan., AGE proposes to destroy all six Wells by pressure grouting the well Casing <br /> using 110 to 15 paunds per square inch (psi) of pressure. No throe limit was given for appiying <br /> the pressure. iFolllowing this, AGE proposes to over-drill the well to approxilrmtely three fleet <br /> Mow surface grade (bsg) using 8.25--inch diameter hollow steno gaugers. <br /> The END has reviewed :historical soil and ground ,iter analytical results for this site and <br /> approves only manitoring wells MSV-2 through MW-5 be pressure gratuted_ The EHD directs <br /> that 25 psi of Iliq uid grout pressure be:applied for ten .minutes, follow,ed by over-drilling the well <br /> to appro?e4mately three feet bsg easing hollow sterna gees to create a hole at least a foot larger <br /> in diameter than the originally drilled thole. Since the wells were all installed using eight-inch <br /> augers, the augers used to over-drill the tells to approximately three feet bsg twist be at least <br /> twenty inches in diameter. <br /> Since monitoring wells MW-1 and M"-6 reside in an area of known residual contamination <br /> and since mmedliation of the wail has not taken place at this site, the EflD directs that 71V-1 <br /> and MW-6 be over.-drilled to total depth and the well contents, induding, the well casing, <br /> screen, filter pack and grout seailant, be removed,- the cleared boretnoile is then, to to sealed <br /> with meat cement by pressuregrouting known the bott rai upward to a depth of three to five feet <br /> bsg using a trernie pipe. <br /> With these conditions, the EHD approves the 'work plan to destroy the wells at this site_ The <br /> EHD will modify the permit applications submitted by AGE to reflect these changes prior to <br /> issuing the permits. The END has been notified that the well destruction fieldwork is <br /> scheduled for 26— 27 March 2012. <br />