Laserfiche WebLink
23 March 2004 <br /> AGE-NC Project No. 98-0497 <br /> Page 4 of 4 <br /> 5.0. RECOMMENDATIONS <br /> Based on the results of this and previous investigations, AGE recommends: <br /> • Continued quarterly monitoring of the ground water monitoring network. <br /> • Preparation of a Corrective Action Plan. <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings were based mainly <br /> upon analytical results provided by an independent laboratory. Evaluations of the hydrogcologic <br /> conditions at the site have been made from a limited number of available data points(i.e.monitoring <br /> wells, ground water samples) and subsurface conditions may vary away from these data points. No <br /> other warranty, expressed or implied, is made as to the professional interpretations, opinions and <br /> recommendations contained in this report. <br /> Advanced GeoEnyh-OnMCRtal,Inc. <br />