Laserfiche WebLink
1 <br /> ' 20 October 2004 <br /> . AGE-NC Project No 98-0497 <br /> tPage 4 of 4 <br /> ' 5.0. RECOMMENDATIONS <br /> Based on the results of this and previous investigations,AGE recommends performance of the next <br /> ' monitoring and sampling event of the ground water well network <br /> ' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> ' environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site have been made from a limited number of available data points(i e monitoring <br /> ' wells, ground water samples) and subsurface conditions may vary away from these data points No <br /> other warranty, expressed or implied, is made as to the professional interpretations, opinions and <br /> recommendations contained in this report <br /> • r <br /> 1 <br /> 1 <br /> • <br />' Advanced GeoEnviro a mental <br />