Laserfiche WebLink
SHELL WELL MONITORING DATA SHEET ' <br /> o f roc v-T l Site: -)y t 'C- <br /> - Date: <br /> CDate: 1 a _ q_o • <br /> yell I.D.: V' .-. Well Diameter: 2 3 [ 6 8 <br /> "otal Well Depth (TD): Depth to Water (DTW): <br /> )epth to Free Product: Thickness of Free Product (feet): <br /> .eferenced to: ( v0 Grade D.O. Meter (if re 'd): 1 A <br /> $1"ur)TW with 80% Recharge [(Height of Water Column x 0.20) +DM: 16. 11— <br /> Urge <br /> ge Method: Boiler Waterm Sampling Method: 2vilc ' <br /> Dispasalile Bailer Peristaltic Disposable Bailer. <br /> ACddl!ebur Extraction Pump Extraction Port <br /> ectric Svb ible other Dedicated Tubing <br /> Other. <br /> Wall diameter MultiI� WO binmeier Mullioller <br /> 1 '''} I" 0.04 d" 4.69 <br /> ^•� (Gals.)X • / Gals. r 6.16 6" 1.47 <br /> Case Volume Specified Volumes Calculated Volume 3p, 11.37 (Wmr mdiu?*U.163 <br /> Cond. Turbidity <br /> Time Temp (°F) pH (MS or (NTUs) Gals.Removed Observations <br /> 1110 -7$70 <br /> 1 i tl 73.1 -7- f <br /> iI � 3 73.1 -7. r [ ( 1% <br /> )id well dewater7 Yes o Gallons actually evacuated: 9 <br /> .ampling Date: 10-9-o l- Sampling Time: Depth to Water: o. <br /> ample I.D.: Laboratory: Kai SPL Other <br /> malyzed fo • Px-G BTEX �vt�r TPH-D Other. <br /> ;B I.D. (if applicable): nnn Duplicate I.D. (if applicable): <br /> Lnalyzed for: TPH-G BTEX MTBE TPH-D Other. <br /> ).O. (if req'd): Pre-purge: myPost-purge: <br /> ).R.P. (if req'd): Fre-purge: mV Post-purge: <br /> MV • <br /> ilaine Tech Services, Inc. 680 Rogers Ave., San Jose, CA 95112 (800) 545-7558 <br />