Laserfiche WebLink
1 1 <br /> WELL MONITORING DATA SHEET <br /> Project#: o1 o o Client: <br /> Sampler: Start Date: <br /> Well I.D.: mow- Well Diameter: Q 3 4 6 8 <br /> Total Well Depth: -7 . Le Depth to Water: <br /> Before: After: Before: After: <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: VC Grade D.O. Meter (if req'd): sl HACH <br /> Purge Method: Sampling Method: Bailer <br /> Bailer Waterra Disposable Bailer <br /> Disposable Bailer Peristaltic Extraction Port <br /> V"Middleburg Extraction Pump Dedicated Tubing <br /> Electric Submersible Other Other: <br /> Well Diameter Multiplier Well Diamcter Multiplier <br /> 1" 0.04 4" 0.65 <br /> -7•I- (Gals.)X 3 = Z ti• b Gals. 2" 0.16 6" 1.47 <br /> 1 Case Volume Specified Volumes Calculated Volume 3' 0.37 Other radius,0.163 <br /> Time Temp CF) PH - Cond. Turbidity Gals_ Removed Observations <br /> �6S, Z ", ( 3S 110 . <br /> 6s • i 7.Z SH % 7 ZZ t t <br /> 15 V r Ly w 7 <br /> Did well dewater? Yes No Gallons actually evacuated: <br /> Sampling Time: o o Sampling Date: <br /> Sample I.D.: Laboratory: Se- <br /> fiA <br /> Analyzed for: H-G E MTBE TPH-D Other: oxyaetio4+t C by `Z6o yt4�,o �J <br /> Equipment Blank I.D.: @ Tan. Duplicate I.D.: <br /> A lz,-pari fr%r• TPH-G BTEX MTBE T-vu_n ()#hPr- <br /> ( a. gI <br /> D.O. if req'd): Pre-purge: mg�i ``=^ oslpiirg` : . 1 m <br /> ORF (if req'd): Pre-purge: mV Post-purge: mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave.. San jose, CA:95112 (408) 573-0555' <br />