Laserfiche WebLink
SITE SAFETY WORK PLAN <br /> PERSONNEL <br /> Team Member(list) Title Responsibility <br /> Tom Landwehr Project Engineer Site Coordinator <br /> Robert P. Warner Senior Geologist Project' Geologist <br /> Douglas I. Sheeks Senior Geologist Site Safety and <br /> Health Officer <br /> Perimeter Establishment: <br /> Map/Sketch Attached? Yes xx No Site Secured? Yes_ No XX <br /> Perimeter Identified? Yes XX No Zero line defined?Yes No <br /> XX <br /> Free Product? Yes No Dissolved Product?Yes No <br /> INVESTIGATION-DERIVED MATERIAL DISPOSAL: <br /> Soil removed from the borings will .be placed on and covered by plastic <br /> sheeting. Any material disposed of off site will be disposed of in <br /> ,; accordance with existing regulations and guidelines. <br />