My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
2409
>
3500 - Local Oversight Program
>
PR0505603
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 10:21:12 AM
Creation date
3/9/2020 8:25:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505603
PE
2950
FACILITY_ID
FA0006892
FACILITY_NAME
SHERMAN HINAMAN TRUST ET AL
STREET_NUMBER
2409
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15542001
CURRENT_STATUS
01
SITE_LOCATION
2409 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> I <br /> i <br /> i <br /> Chevron U.S.A. Products Co. -2- May 24, 1999 <br /> i <br /> process into phases. In addition, Article 11 requires the responsible party to submit an investigative <br /> workplan/Corrective Action Plan (CAP)before performing any work. This phasing process and the <br /> workplan/CAP requirements were intended to: <br /> 1. help the responsible party undertake the necessary corrective action in a cost-effective,efficient and timely. <br /> manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and l <br /> i <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by the <br /> regulatory agency to achieve the minimum cleanup necessary to protect human health,safety and the <br /> —environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated immediate hazard to <br /> public health,or the environment. ,Program regulations allow the responsible party to undertake interim <br /> remedial action after: (1)notifying the regulatory'agency of the proposed action, and; (2)complying with any <br /> requirements that the regulatory agency may set. Interim remedial action should only be proposed when <br /> necessary to mitigate an immediate demonstrated hazard.Implementing interim remedial action does not <br /> eliminate the requirement for a CAP and an evaluation of the most cost-effective corrective action <br /> alternative. <br /> Three bids and Cost Preapproval: Only corrective action costs required by the regulatory agency to protect f <br /> human health, safety and the environment can be claimed for reimbursement. You must comply with all <br /> regulatory agency time schedules and requirements and you must obtain three bids for any required convective <br /> action. Unless waived in writing,you are required to obtain preapproval of costs for all future corrective <br /> action work. If you do not obtain three bids and cost preapproval, reimbursement is not assured and costs <br /> may be rejected as ineligible. <br /> If you have any questions,please contact me at(916)227-4411. . <br /> Sincerely, <br /> i <br /> i <br /> Sandy Gill <br /> Claims Review Unit <br /> Underground Storage Tank Cleanup Fund f <br /> cc: Mr. Gordon Boggs Ms. Margaret Lagorio <br /> RWQCB, Reg. 5 - Sacramento San Joaquin County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> j <br /> I <br /> i <br />{ <br /> California Environmental Protection Agency <br /> Recycled Paper <br /> 1 _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.