Laserfiche WebLink
i <br /> i <br /> SITE HEALTH & SAFETY PIAN <br /> 1.0 INTRODUCTION <br /> A. <br /> Overview <br /> The project site is located at 2409 East Main Street in Sto <br /> immediate vicinity of the site is co c kton, California. Land use in the <br /> mmercial and residential:during performed at the site includes samplingThe scope of.work to be <br /> site is shown on Figure 1. in g drilling of one soil boring.g The location of the <br /> j <br /> 2.0 PROJECT SAFETY AUTHORITY <br /> A. ON-SITE PROJECT SAFETY <br /> Personnel responsible for the project safety are: <br /> i <br /> Mr. Brett Hunter Engineer <br /> f <br /> Chevron Products <br /> Company <br /> Mr. Dennis Jonesh <br /> Staff Geologist r <br /> Project Safety Officer <br /> (Pacific Environmental <br /> Group,- Inc.) <br /> Mr. Mike Hurd � <br /> Company Safety <br /> Officer <br /> (Pacific Environmental <br /> Group, Inc.) <br />