Laserfiche WebLink
STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following laboratory procedureho sampleson ollecaionnahe type <br /> ling of <br /> groundwater samples prior to analysis by the analytical rY Prior <br /> of analysis to be'performed is determined Loss prevention of volatile compounds is controlled and <br /> sample preservation for subsequent analysis is maintained <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe Product thickness, if present, is measured to the nearest 0 01 foot and is noted in the field notes <br /> In addition, static water level measurements are collected with the interface probe and are also recorded <br /> in the field notes <br /> mum of <br /> well <br /> After water levels are collected and prior to sampling,tack, suctionings G ndfos)�ori polyvinyl hchloride <br /> casing volumes of water using pre-cleaned pump <br /> bailers Temperature, pH and electrical conductivity are measured a minimum of three times during the <br /> purging Purging continues until these parameters stabilize <br /> • Groundwater samples are collected using Chevron-designated disposable bailers The water samples are <br /> transferred from the bailer into appropriate containers Pre-preserved containers, supplied by or <br /> alytical <br /> laboratories, are used when possible When pre-preserved containers are not available, <br /> the instructed to preserve the sample as appropriate Duplicate samples are collected for the laboratory to <br /> use in maintaining quality assurance/quality control standards The samples <br /> mplle are <br /> {f any), <br /> dd o ithencl sample <br /> e the <br /> job number,sample identification,collection date and time, analysis,p <br /> collector's initials The water samples are placed are maintcooler, <br /> ained under chain of custody <br /> until delisport vered <br /> laboratory Once collected in the field, all samples <br /> to the laboratory <br /> The chain of custody document includes the job number,type of preservation,if any, analysis requested, <br /> sample identification,date and time collected, and the spersonle colleor's ne. The chain of custody is <br /> or surrenders the samples, <br /> signed and dated (including time of transfer) by each who receives <br /> beginning with the field personnel and ending with the laboratory personnel <br /> ling sets <br /> ter than <br /> A laboratory supplied trip blank accompanies each sampling set far some or all of the same compounds <br /> samples,5% trip blanks are included The trip blank is y� <br /> as the groundwater samples <br /> As requested by Chevron Products Company, the purge water and decontamination water generated <br /> during sampling activities is transported by IWM to McKittrick Waste Management located in <br /> McKittrick, California <br /> N\CahformaVmw6\L ew0n•SOP 10100 <br />