Laserfiche WebLink
. w. <br /> V <br /> Mr. Ron Rowe CAMBRIA <br /> July 11, 1997 <br /> • Tabulated soil and ground water analytic results, <br /> • Analytic reports and chain-of-custody forms, <br /> • Soil and water disposal methods, and <br /> • A discussion of the hydrocarbon distribution._ <br /> SCHEDULE <br /> Upon receiving written work plan approval from the SJCPHS, Cambria will obtain county permits and <br /> commence drilling. We will submit our investigation report about six weeks after completing the field work. <br /> We appreciate the opportunity to work with you on this project. Please call if you have any questions or <br /> comments. <br /> Sincerely, <br /> Cambria Environmental Technology,Inc. <br /> 0 RED G <br /> T Ma OZO <br /> Owen C. Ratchye <br /> Project Engineer <br /> �,. No. 5747 <br /> s <br /> cauFCF�`� <br /> N. Scott MacLeod <br /> Principal Geologist <br /> cc: Mr.A. E. (Alex)Perez, Shell Oil Products Company,P.O.Box 4023, Concord, CA 94524 <br /> Attachment A-Standard Field Procedures <br /> F:\PROJECTNSHELL\Mant 1071\Wkpin.wPD <br /> I <br /> i <br /> `j <br />