My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REPORT SUMMARIZING INSTALL OF MONITORING WELLS MW4,MW5,MW7,MW8 & SOIL BORING RDM1 & 4TH QTR 2013 GROUNDWATER SAMPLING
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3138
>
2900 - Site Mitigation Program
>
PR0536580
>
ARCHIVED REPORTS_REPORT SUMMARIZING INSTALL OF MONITORING WELLS MW4,MW5,MW7,MW8 & SOIL BORING RDM1 & 4TH QTR 2013 GROUNDWATER SAMPLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 9:59:30 PM
Creation date
3/9/2020 9:43:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REPORT SUMMARIZING INSTALL OF MONITORING WELLS MW4,MW5,MW7,MW8 & SOIL BORING RDM1 & 4TH QTR 2013 GROUNDWATER SAMPLING
RECORD_ID
PR0536580
PE
2960
FACILITY_ID
FA0021000
FACILITY_NAME
HUNTBROOK HOLDINGS
STREET_NUMBER
3138
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15710403
CURRENT_STATUS
01
SITE_LOCATION
3138 E MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Angela Lee <br /> Huntbrook Holdings,LLC <br /> February 12,2014 <br /> j Page 13 <br /> • May 2014-perform the remedial pilot testing; <br /> • By July 31,2014- submit site conceptual model(SCM)and corrective action plan(CAP); <br /> • September 2014-perform the third quarter 2014 semiannual groundwater monitoring event(all <br /> • seven monitoring wells); <br /> • By October 31,2014-submit Second Half 2014 semiannual groundwater monitoring report; <br /> • By December 2014—implement CAP, if necessary <br /> Remarks/Sienatures <br /> The interpretations contained in this document represent our professional opinions, and are based in <br /> part, on information supplied by the client. These opinions are based on currently available information <br /> and are arrived at in accordance with currently accepted hydrogeologic and engineering practices at this <br /> time and location. Other than this,no warranty is implied or intended. <br /> This Workplan has been prepared solely for the use of Huntbrook Holdings, LLC. Any reliance on this <br /> report by third parties shall be at such parties' sole risk. <br /> We appreciate this opportunity to be of service. If you have any questions regarding this project,please <br /> contact Richard Munsch at(916)415-1134 or Mike Berrington at(916)749-9222. <br /> • <br /> Sincerely, <br /> RDM ENVIRONMENTAL INC <br /> Ay\Ot�AL GFO <br /> Richard D.lo �y �O <br /> Project Manager MICHAEL A. N <br /> BER o.7124 N �► <br /> ,,.G/ • <br /> No.7124 • <br /> Q <br /> Mic ael A. <br /> Senior Geologist T9�. \FOS 2/12/14 <br /> California Professional Geologist No. 7124 OF CA\- <br /> RDM(Huntbrook Holdings Report Summarizing Installation of Monitoring Wells MW-4, MW-5, MW-7 <br /> and MW-8, and Soil Boring RDM-1 and Fourth Quarter 2013 Groundwater Sampling 2-06- <br /> 14.doc) <br /> Enclosures: <br /> • Enclosure A: OSCF Directives <br /> • Enclosure B: CVRWQCB Correspondence <br /> • Enclosure C: Historic Soil Sample Analytical Results <br /> • Enclosure D: Field Methods and Procedures <br /> • Enclosure E: SJCEHD Drilling Pemrits <br /> • Enclosure F: Boring Logs and Monitoring Well Construction Details <br /> • Enclosure G: Kiff Laboratory Analytical Report- Soil Boring Samples <br /> a • Enclosure H: Monitoring Well Development Field Sheets <br />
The URL can be used to link to this page
Your browser does not support the video tag.