Laserfiche WebLink
Ms.Angela Lee <br /> Huntbrook Holdings,LLC <br /> February 12,2014 <br /> j Page 13 <br /> • May 2014-perform the remedial pilot testing; <br /> • By July 31,2014- submit site conceptual model(SCM)and corrective action plan(CAP); <br /> • September 2014-perform the third quarter 2014 semiannual groundwater monitoring event(all <br /> • seven monitoring wells); <br /> • By October 31,2014-submit Second Half 2014 semiannual groundwater monitoring report; <br /> • By December 2014—implement CAP, if necessary <br /> Remarks/Sienatures <br /> The interpretations contained in this document represent our professional opinions, and are based in <br /> part, on information supplied by the client. These opinions are based on currently available information <br /> and are arrived at in accordance with currently accepted hydrogeologic and engineering practices at this <br /> time and location. Other than this,no warranty is implied or intended. <br /> This Workplan has been prepared solely for the use of Huntbrook Holdings, LLC. Any reliance on this <br /> report by third parties shall be at such parties' sole risk. <br /> We appreciate this opportunity to be of service. If you have any questions regarding this project,please <br /> contact Richard Munsch at(916)415-1134 or Mike Berrington at(916)749-9222. <br /> • <br /> Sincerely, <br /> RDM ENVIRONMENTAL INC <br /> Ay\Ot�AL GFO <br /> Richard D.lo �y �O <br /> Project Manager MICHAEL A. N <br /> BER o.7124 N �► <br /> ,,.G/ • <br /> No.7124 • <br /> Q <br /> Mic ael A. <br /> Senior Geologist T9�. \FOS 2/12/14 <br /> California Professional Geologist No. 7124 OF CA\- <br /> RDM(Huntbrook Holdings Report Summarizing Installation of Monitoring Wells MW-4, MW-5, MW-7 <br /> and MW-8, and Soil Boring RDM-1 and Fourth Quarter 2013 Groundwater Sampling 2-06- <br /> 14.doc) <br /> Enclosures: <br /> • Enclosure A: OSCF Directives <br /> • Enclosure B: CVRWQCB Correspondence <br /> • Enclosure C: Historic Soil Sample Analytical Results <br /> • Enclosure D: Field Methods and Procedures <br /> • Enclosure E: SJCEHD Drilling Pemrits <br /> • Enclosure F: Boring Logs and Monitoring Well Construction Details <br /> • Enclosure G: Kiff Laboratory Analytical Report- Soil Boring Samples <br /> a • Enclosure H: Monitoring Well Development Field Sheets <br />