Laserfiche WebLink
Cherokee Freight Lines <br />Cont, ---ncy Plan 200 6 Hazardous WastE d Materials <br />SECTION ION 3 <br />EVACUATION PROCEDURES <br />A. EMPLOYEE EVACUATION <br />Evacuation Leader: <br />DA.►' <br />S hift <br />�. �A Y <br />2. <br />93 <br />Hours <br />Z <br />Number of Employees <br />�J <br />Method of Employee Notification (i.e., siren, public address system, verbal...) <br />Evacuation Routes Posted: Yes"/No <br />Assembly Area(s).for Evacuation. <br />B. SURROUNDING OCCUPANCIES AND LAND USE WITHIN 1/8 MILE: <br />(i.c., schools; hospitals, residential, commercial, open space...) <br />North �� 3 i �--�1 ) i PSC_ <br />South <br />Q <br />West r IE <br />2 <br />