My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
5463
>
2200 - Hazardous Waste Program
>
PR0513737
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:46:03 PM
Creation date
3/9/2020 9:50:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513737
PE
2228
FACILITY_ID
FA0009268
FACILITY_NAME
CHEROKEE FREIGHT LINES-MAIN
STREET_NUMBER
5463
Direction
E
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95215-1120
APN
08712143
CURRENT_STATUS
01
SITE_LOCATION
5463 E CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for SPCC Plan Preparation <br /> This proposal is provided to(insert Customer's name)C 4 e.2 o\4.e.e. l;.N Cs("Customer") <br /> for the preparation of a complete Spill Prevention, Control,and Countermeasure(SPCC) Plan("SPCC <br /> Plan")by Cameron Cole, LLC for Customer's (insert name of facility) <br /> facility located in(insert address of facility) 5"'`I(a 3 Lis Z_,e,u.G6 V__0 <br /> 5-V0C_ �, C-,^�, 9 S21!j� ("Facility") . Changes to SPCC <br /> Plans are required by revised U.S. Environmental Protection Agency(EPA) regulations (40 CFR Part 112) <br /> that were finalized on July 17, 2002. The EPA requires that SPCC Plans be completed by August 17, <br /> 2004. <br /> The scope of work will include the following: <br /> 1. Facility Inspection: A compliance expert will conduct a facility inspection, which is required by <br /> the regulations. This will help to identify any deficiencies and to prepare the facility diagram. <br /> 2. Plan Preparation: The SPCC Plan will be prepared for the Facility in accordance with the <br /> regulations. As required,the plan will address tank/piping design and testing, site security, <br /> employee training,proper facility drainage, and secondary containment for tanks,containers, and <br /> areas where oil is loaded/unloaded. <br /> 3. Plan Certification: SPCC Plans must be certified by a registered Professional Engineer(P.E.)to <br /> verify that they have been appropriately prepared and comply with the regulations. <br /> The pricing to prepare the plan in accordance with the above scope of work is $ 35-0a, <br /> T,imitatinnc <br /> If Cameron Cole, LLC determines that the site complexity reasonably requires additional effort beyond the <br /> standard level of effort envisioned, Cameron Cole, LLC will notify you as soon as possible and await <br /> authorization for this additional work. <br /> Completion of the SPCC Plan on or prior to the August 17, 2004 regulatory deadline is contingent upon <br /> receiving the existing Plan and facility diagram within a reasonable timeframe, and the reasonable <br /> availability of appropriate facility personnel to schedule the inspection and provide follow-up information, <br /> as needed. <br /> Thank you for the opportunity to provide this proposal. Once authorized, Cameron Cole, LLC will you to <br /> schedule the facility inspection at a convenient time within the next few weeks. <br /> Custom C.tie;t.�vd o G,re-ti,g �r 14 - 3 <br /> M <br /> Title: 0.— ' .�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.