My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
FIELD DOCUMENTS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:04:11 AM
Creation date
3/9/2020 9:51:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
FILE 2
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Wells with unknown construction and/or located in an area of known or suspected <br /> contamination <br /> 2. Wells will be destroyed by pressure grouting and left in place if the most recent sampling <br /> laboratory data reports non-detectable concentrations of contaminants of concern and with <br /> acceptable laboratory detection limits. <br /> • A neat cement grout (containing less than 4% bentonite) will be pumped under pressure <br /> through a tremie pipe to the bottom of the well. <br /> • After the groundwater has been removed and the grout has been filled to the top of the <br /> well casing, a pressure cap will be fitted to the casing and the well pressurized to 25 psi. <br /> If the grout settles, additional grout will be pumped into the well casing. This assures <br /> grout is pumped into the filter pack. <br /> • Following grouting, at least the top three (3) feet of the well will be drilled out with an <br /> auger that is at least one (1) foot larger in diameter than the auger originally used to <br /> install the well. <br /> • In addition, the soil around the cut-off casing will be removed to a depth of an additional <br /> six (6) inches below the top of the cut-off casing. Upon filling the rest of the casing, <br /> grout sealant will be allowed to spill out of the top of the well casing to form a mushroom <br /> cap seal, with at least six (6) inches of grout both below and above the casing. <br /> All soil will be properly containerized for disposal. All groundwater displaced to the surface <br /> during grout installation shall be pumped out of the excavation and containerized for proper <br /> disposal. <br /> Schedule and Renortin� <br /> Following SJCEHD approval of this well abandonment work plan, Ground Zero Analysis, Inc. <br /> will obtain bids from licensed drilling contractors and obtain the proper permits prior to <br /> commencing work. Our goal is to complete the well destruction work by mid June contingent <br /> upon work plan approval. <br /> A summary of the well destruction and site closure activities will be presented in a report, <br /> including a discussion of the well destruction efficiency (grout volume used versus grout volume <br /> calculations). Copies of the report will be submitted to both the appropriate County and State <br /> regulatory agencies prior to July 1, 2013. <br /> If you should have any questions please do not hesitate to call. <br /> Respectfully Submitted, 0\0 <br /> 4 <br /> A` GFp� <br /> a RAYNOL 1. <br /> KABLANOW <br /> Raynold Kablanow II, Ph, No.5234 ' <br /> California Professional Geologist#5234 1,9r -z1_)4 Q�\� <br /> Certified Hydrogeologist#442 FOF CAO- <br />
The URL can be used to link to this page
Your browser does not support the video tag.