My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 7:55:35 PM
Creation date
3/9/2020 9:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> �•' —Ey` '0 Donna Heran,REHS <br /> 600 East Main Street <br /> AM <br /> Stockton, California 95202-3029 PROG <br /> Robe�McCleloRnDREHSORS <br /> :. <br /> -�.• <br /> Jeff Carruesco, RENS,RDI <br /> cq •.�..-��P Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> �IFOR <br /> Phone: (209)468-3420 <br /> Fax: (209)464-0138 <br /> September 13, 2010 <br /> Mrs. Margaret A. Marci <br /> 20 Mobile Lane <br /> Crescent City, California 95531-8409 <br /> Subject: Marci Property <br /> 2969 Loomis Road <br /> Stockton, California 95205 <br /> Dear Mrs. Marci: <br /> The San Joaquin County Environmental Health Department (EHD) has reviewed 1ST Semi- <br /> annual Groundwater Monitoring Report (2"d Quarter 2010) (report), dated 21 July 2010, <br /> prepared by your consulting firm, Geological Technics Inc. (GTI) for the above-referenced <br /> subject site. GTI states in the report that in June 2010, high vacuum soil vapor extraction <br /> (SVE) was initiated (as part of three dual phase extraction pilot tests) and the remedial <br /> effectiveness of the SVE will be addressed in a report of findings in the third quarter 2010. <br /> GTI recommends that prior to preparing a corrective action plan, the soil and groundwater <br /> data collected during the pilot tests be incorporated in revising the Site Conceptual Model <br /> (March 2006 Revision), dated 20 April 2006, and that the data be used to estimate the <br /> current lateral and vertical extents of the contamination plume and update the mass <br /> estimates. GTI also recommends that a hydro-geological evaluation of groundwater data <br /> be completed to analyze the reported spikes in contaminant concentrations. <br /> The EHD assumes that whenever new data are made available as part of an ongoing site <br /> investigation, that the site conceptual model report will be revised accordingly, and the <br /> report of findings will include current lateral and vertical extents of the groundwater <br /> contaminant plume, and revised mass estimates, if appropriate. If anomalies exist (such <br /> as reported spikes in groundwater contaminant concentrations), the EHD believes it part <br /> of the on-going investigation to examine and provide technical explanation for them <br /> without direction from the EHD. For the sake of clarity, as new data relevant to your site <br /> are developed, you are directed to incorporate the data into the existing site conceptual <br /> model, or modify the site conceptual model, as appropriate, and present interpretations <br /> and recommendations based on the updated site conceptual model to the EHD to most <br /> properly and effectively manage the environmental impacts associated with the <br /> unauthorized release from your former underground storage tank system. <br /> Please submit the report for the three dual phase extraction pilot tests to the EHD during <br /> the third quarter 2010 and include all appropriate information relevant to this site. If you <br />
The URL can be used to link to this page
Your browser does not support the video tag.