My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:24:52 AM
Creation date
3/9/2020 9:59:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Ceotogicat Techltics Inc. <br /> 2741 River Road U l DUI, - PN 1: 3 b <br /> Modesto,Califomia 95351 <br /> (209)538-6424/Fax#538-5852 <br /> Work Plan Addendum <br /> Additional Site Characterization <br /> Soil Boring&Monitoring Well Installation <br /> Marci's Property <br /> 2969 Loomis Road <br /> Stockton, CA <br /> Project No. 770.2 <br /> November 30, 2001 <br /> Proposed Boring/Well Location <br /> Two additional shallow monitoring wells will be advanced in the locations identified in the <br /> attached Figure 1. These locations are selected in accordance with Sam Savig's November <br /> 16, 2001 directive. The borings will be drilled with those procedures detailed in GTI's <br /> "Additional Site Characterization — Soil Boring and Monitoring Well Installation Work <br /> Plan" dated October 25, 2001. Two shallow screened monitoring wells will be constructed <br /> in the borings following procedures as above. <br /> Well o. Dia./TD Screen of Sand PackTrans. Urout Seal <br /> Lw:.� Seal <br /> ' - X12 sand-5T-7D'51 - -sur ace <br /> - - san - - 51'-surface <br /> The new wells will be developed and incorporated into the existing quarterly monitoring in <br /> accordance with those procedures detailed in GTI's "Additional Site Characterization —Soil <br /> Boring and Monitoring Well Installation Work Plan"dated October 25, 2001. <br /> Signature and Certification <br /> Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This workplan are <br /> was lan prepared : <br /> p p p Y <br /> T!,Lrl . <br /> Joseph Angulo <br /> Geologist <br /> � o <br /> R.I.KI�I/VOt7Vd M <br /> L7 UJ <br /> Raynold L Kablanow II, Ph.D. * 8 01 <br /> California Registered Geologist#5234 �l�rE �• Fp��\t <br /> Certified Hydrogeologist#442 C, <br />
The URL can be used to link to this page
Your browser does not support the video tag.