My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:24:52 AM
Creation date
3/9/2020 9:59:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geologkal ireckxics/Ac. Page 3 <br /> Work Plan—Additional Site Characterization <br /> Marci's Property <br /> Project No. 770.2 <br /> October 25,2001 <br /> I <br /> The detection limits for these compounds are listed below. A Chain of Custody will be <br /> completed for all samples collected and tracked to ensure sample integrity. <br /> L <br /> DetectionLimits:of (pg/Kg) 1,000 <br /> I <br /> 2.1.3 Monitoring Well Construction <br /> I <br /> The construction of the deep wells will be the same as the existing deep well MW-105. The <br /> construction details are outlined in the table below: <br /> CWell No. Dia./TD Screen Slot Sand PackTrans. Grout Seal <br /> Seal <br /> - san = _ 86'-surface <br /> MW-106 90 <br /> sand -sur ace <br /> i <br /> i <br /> The wells will be constructed using. two inch (27) schedule 40 PVC casing with flush <br /> threads. Before installing the bentonite seal the wells will be surged using a clean surge <br /> block to achieve maximum filter pack-density. The transition seals will consist of weighted <br /> bentonite pellets. A surface seal will be achieved by pumping a neat cement grout <br /> (augmented with < 4% bentonite) through the augers, :as they are withdrawn to ensure that <br /> an integral grout seal is achieved. The wells will be secured with locking watertight caps <br /> encased in flush mounted traffic.rated well boxes. Well construction details are illustrated in <br /> Figure 3. <br /> 2.1A Monitoring Well Development <br /> After the well sealing materials have set (>24 hours), all of the new wells will be developed <br /> (using mechanical surging and pumping methods) until a clear stream of water is obtained. <br /> The wells will be purged and groundwater samples collected after well development. All <br /> development and purge water will be containerized in 55 gallon DOT approved containers <br /> and stored on site until their disposition can be arranged. <br /> 2.1.5 Well Head Elevation and Location Survey <br /> In accordance with Assembly Bill 2886, the location.and elevation of the new and existing <br /> well casings will be determined by a licensed surveyor. The surveyor will reference the <br /> casings into a benchmark elevation and this data will be included in future groundwater <br /> monitoring reports. <br /> 2.2 Groundwater-Monitoring <br /> The new wells will be incorporated into the current quarterly sampling/monitoring schedule. <br /> The schedule will be augmented with monthly depth to groundwater measurements to better <br /> define groundwater direction gradient trends. <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.