My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:24:52 AM
Creation date
3/9/2020 9:59:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Geological Tec&dCS lftc. Page 5 <br /> Work Plan—Additional S.ite:Characterization <br /> Marci's Property <br /> LProject No. 770.2 <br /> October 25,2001 ^ <br /> L , <br /> • Benzene, toluene, ethylbenzene and xylene(BTEX)by EPA method 602/5030. <br /> • Gasoline range petroleum hydrocarbons (TPH-G) by EPA method 5030/8015(m) <br /> L • Total Extractable Petroleum Hydrocarbons TEPH as Diesel Kerosene Dielectric and <br /> Motor Oil by EPA method 3510/8015(M) <br /> • Methanol & Ethanol by GC-FID—wells MW-5 &MW-105 (one event only) <br /> The detection limits for these compounds are listed below. A Chain of Custody will be <br /> Lcompleted for all samples collected and tracked to ensure sample integrity. <br /> etectioi TEPH TPTTGet Eth. <br /> Water(µg/L) 0.3-0.6 50 ( — 50 5000 <br /> 3.0 SCHEDULE & REPORTING <br /> L <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after cost <br /> pre-approval from the fund. The information gathered during this phase of work will be <br /> Lpresented in a report that will include a summary of:the geology as well as the results of <br /> -sample analyses. Dr. Ray Kablanow, a registered professional geologist, will supervise the <br /> project. Copies of the report will be forwarded to both the appropriate County and State <br /> L <br /> regulatory agencies (SJC PHS/EHD and CRWQCB). <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> L <br /> Geological Technics Inc. will perform this project in accordance with accepted geologic and <br /> hydrologic standards of the State of California accepted and in effect at the time of this <br /> investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> 4 <br /> E <br /> i <br /> Josep . Angulo <br /> LQGeologist Essto A. <br /> 'I'D IR <br /> a cF <br /> o <br /> Ri1:`KABlf1�lO'W N r� <br /> UJ <br /> V- ex -� <br /> Raynold I. Kablanow II Ph.D. <br /> California Registered Geologist#5234 <br /> California Certified Hydrogeologist#442 ° O�CA <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.