My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOOMIS
>
2969
>
3500 - Local Oversight Program
>
PR0545428
>
WORK PLANS_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 11:15:13 AM
Creation date
3/9/2020 10:01:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0545428
PE
3528
FACILITY_ID
FA0005487
FACILITY_NAME
MARCIS DIESEL SERVICE
STREET_NUMBER
2969
STREET_NAME
LOOMIS
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2969 LOOMIS RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological recknics Inc. Page 7 <br /> . .Additional Pilot Test Work Plan <br /> Project No.770.2 <br /> January 23,2009 <br /> i � <br /> 4.0 DUAL PHASE EXTRACTION TEST <br /> Soil vapor extraction..and_-groundwater extraction are two proven technologies for the <br /> remediation of gasoline impacted sites. Dual phase extraction involves the use of high <br /> vacuum technology to simultaneously extract groundwater and soil vapor from one well. By W ' <br /> inducing_a cone of depression by extracting groundwater, additional vadose-zone soil,ls.._ <br /> exposed-to vapor.extraction.' For the purpose sof thi pilot test, GTI proposes to utilize a <br /> mobile treatment unit for a period of two-w�-w -acted vapors will be treated with a <br /> thermal oxidizer and groundwater will be stored in a trailer and hauled off site for disposal <br /> GTI'will attempt to minimize groundwater extraction (except for the'core of the plume) and <br /> apply the full vacuum-tothe,vadose zone``"' "_. - a <br /> Groundwater samples influent to the knock out tank will be collected for estimating the <br /> contaminant mass ,removal. Groundwater samples will be analyzed for the following <br /> compounds: <br /> • TPH-D using EPA Method 8015M ��- <br /> • TPH-G using EPA Method 8260 <br /> I <br /> • BTEX using EPA Method 8260 <br /> Vapor samples are also collected for estimating the contaminant mass removal in vapor <br /> phase. Vapor samples are analyzed for the following compounds: /IT-60AX ao,rb&40- lv�' <br /> • TPH-D using EPA Method TO-17, samples will be collected in charcoal tfiibes <br /> i <br /> • TPH-G using EPA Method TO-15, samples will be collected in Soma anister <br /> • BTEX using EPA Method TO-15, samples will be collected in Soma Canister <br /> � 0-f- 7V 3 <br /> Over the course of this tw� eek„dual.phase pilot test at least 6 groundwater samples.and <br /> vapor samples will be collected. Throughout the test,-_groundwater'flow rate, vacuum,pair <br /> flow rate, temperature, influent and effluent vapor OVM measurements, groundwater level in <br /> neighboring groundwater wells and vacuum on top of extraction or monitoring wells in the <br /> . vicinity of original extraction well will be monitored.bVM readings are also recorded on top <br /> I <br /> of neighboring wells. <br /> Al r V <br /> 4.1 Extraction Wells <br /> I` t GTI proposed to install- three_new.extraction wells with the-.constructional.specifications <br /> given in the following table. The boring diameter is 10 inches and.well casing-:diameter.is,4 <br /> _ �. - .• <br /> inches-in all„3�wells. EW-4.-and EW-5 are dual phase extraction wells and EW-6 is solely <br /> Lsoil vapor extraction well since its entire screen interval is situated in vadose zone. <br />
The URL can be used to link to this page
Your browser does not support the video tag.