Laserfiche WebLink
DEL-TECH GeotechnicalSupport 'NonILLS <br /> MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME SAMPLE ANALYSIS PERFORMED TPH-Gas, DIESEL, <br /> MARCI DIESEL BTX E <br /> LOOMIS ROAD SAMPLE TIME, 15 40 <br /> STOCKTON, CA SAMPLE CONTAINERIS) HCL PRESERVED <br /> V O A's , 1 LITER& 1 BAILER BLANK <br /> CONTAINERS SUPPLIED BY LABORATORY <br /> ANALYSIS PERFORMED BY SHERWOOD LABS <br /> CLIENT HUNTER&ASSOCIATES DATE 11/27/1996 <br /> PROJECT MANAGER BILL HUNTER SAMPLE LOCATION MW-1 <br /> AMPLER DON LIGHT START TIME <br /> GROUNDWATER XXX ADOSE: OTHER WELL HEAD P I D READING 0 0 PPM <br /> CASING ELEVATION FEET MSL CASING DIAMETER 4 INCH <br /> DEPTH TO WATER 68 17 FEET CALCULATED CASING VOLUME 13 14 GAL <br /> DEPTH OF WELL 88 30 FEET OTAL VOLUME PURGED 50 5 GAL <br /> TIME VOLUME pH E C. TEMP O.R P COLOR OTHER <br /> gallons units Umhoslcm Degrees C (Mvolts) (Visual 1 NTU <br /> 0 713 860 195 NIA LT TURBID NO ODOR <br /> 135 714 880 199 CLEAR <br /> 370 714 867 198 " <br /> 505 714 865 199 " <br /> PURGE METHOD 2"GRUNDFOS STAINLESS STEEL PUMP <br /> SAMPLE METHOD- T STAINLESS STEEL BAILER <br /> DEPTH TO WATER AFTER PURGE, DEPTH TO WATER AT SAMPLE TIME 69 39' <br /> WELL INTEGRITY- CAP AND SEAL ARE SECURE <br /> REMARKS GOOD RECHARGE <br /> WEATHER OVERCAST SKIES <br /> QUALITY CONTROL ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER &ALCONOX <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES <br /> WELL LOCATION: CENTER WEST <br /> CONTAINMENT D 0 T 17 STEEL DRUM <br /> INSTRUMENTATION- ORION pH/TEMPERATURE METER 2 POINT ISH CALIBRATION (4 0 &7 0) <br /> ORION CONDUCTIVITY METER <br /> YSI 3560 FLOWCELL CHAMBER/D O METER <br /> SOLINIST SLOPE METER 1 KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br />