Laserfiche WebLink
Geo(a�ical?ecFinics 2nc. Page 4 <br /> Addctional Site Characterization Work Plan <br /> Marci's Property <br /> e March 21,2000 <br /> 3.0 SCHEDULE & REPORTING <br /> E <br /> Geological Technics Inc. anticipates that all work will begin as soon as work plan approval <br /> CI and cost pre-approval have been rcceived. The informationathered during this <br /> g g phase of <br /> work will be presented in a report that will include a summary of the geology as well as the <br /> results of sample analyses. Dr: Ray Kablanow, a registered professional geologist, will <br /> supervise the project. Copies of the report will be forwarded to-both the appropriate County <br /> and State regulatory agencies (SJC PHS/EHD and CRWQCB). <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project wil.L�be performed by Geological.Technics Inc. in' accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of thus Investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This workplan was prepared by: <br /> Geoiogica(Techi ics Inc. <br /> Michael J.Niemi <br /> p Geologist <br /> L QQoassio, c <br /> - <br /> . �' R.I.K/►9iAAY0i+!�i M�� . <br /> .523 <br /> Raynold 1. Kablanow II, Ph.D. <br /> California Registe red Geologist #5234. <br /> California Certified Hydrogeologist#442 <br /> �F <br /> c <br /> k <br /> r <br />