Laserfiche WebLink
4"Itov",recknres Inc Page 7 <br /> Groundwater Monitoring Report <br /> Project No 770 2 <br /> September 24, 2003 <br /> GTI makes the following recommendations <br /> • Maintain the modified quarterly monitoring schedule <br /> ' • Prepare a work plan for a pilot study of in situ treatment alternatives This work is in <br /> progress <br /> 3.0 LINIITATIONS <br /> ' This report was prepared in accordance with the generally accepted standard of care and <br /> practice in effect at the time Services were rendered It should be recognized that <br /> ' definition and evaluation of environmental conditions is an inexact science,and that the state <br /> or practice of environmental geology/hydrology is changing and evolving and that <br /> standards existing at the present time may change as knowledge increases and the state of <br /> the practice continues to improve Further, that differing subsurface soil characteristics <br /> can be experienced within a small distance and therefore cannot be known in an absolute <br /> sense All conclusions and recommendations are based on the available data and <br /> information. <br /> The tasks proposed and completed during this project were reviewed and approved by the <br /> local regulatory agency for compliance with the law No warranty, expressed or implied, is <br /> made <br />