Laserfiche WebLink
_. <br /> Geol0Biral?ecknrrs Zne- 3 <br /> Mare's Diesel <br /> Work Plan Addendum <br /> March 2,2000 <br /> 3.0 SCHEDULE & REPORTING <br /> Geological Technics Inc. anticipates beginning fieldwork no later than 30 days after cost pre- <br /> approval from the fund. The information gathered during this phase of work will be <br /> presented in a report that will include a summary of the geology as well as the results of <br /> sample analyses.1 Dr. Ray Kablanow, a registered professional geologist, will supervise the <br /> project. Copies of the report will be forwarded to both'.the appropriate County and State <br /> regulatory agencies (SJC PHSIBHD and CRWQCB). <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will! be performed by Geological Technics Inc: in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: w <br /> Geologicaf Technics .1=. <br /> Michael J. Niemi'4 <br /> Geologist Q�oC.Essionrq� <br /> �� cam° <br /> ti O <br /> NO.5234 yk <br /> Raynold I. Kablanow II, Ph.D. * $• �,(•B.'� <br /> California Registered Geologist#5234 `rygJ�o CALIFo��� <br /> California Certified Hydrogeologist 4442 <br /> L ' <br /> i <br /> t <br />