My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
365
>
3500 - Local Oversight Program
>
PR0545431
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:20:13 PM
Creation date
3/9/2020 11:52:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545431
PE
3528
FACILITY_ID
FA0005191
FACILITY_NAME
FULLER MOBILE HOME PARK
STREET_NUMBER
365
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627022
CURRENT_STATUS
02
SITE_LOCATION
365 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHRONOLOGY <br /> 365 LOUISE, LATHROP <br /> 08/09/90 Complaint received of illegal UST removal. <br /> 09/07/90 A 1,000 gallon leaded gasoline UST and a 500 gallon diesel UST <br /> were removed under PHS/EHD permit and inspection_ <br /> Hydrocarbon odor and soil discoloration were evident. The <br /> excavation was filled with the soil generated during the tank <br /> removals. <br /> 11102190 An unauthorized release report 91-U111 and a Prop 65 notification <br /> 91-270 were filed. <br /> 03/03/92 The site was placed in LOP. <br /> 03/31/92 Four soil borings were completed and grab water samples collected <br /> at 12 feet below surface grade. Contamination was again <br /> observed. <br /> 04/10/92 Phase I Remedial Report - Soil and groundwater contamination <br /> confirmed by lab analysis of samples taken (BTEX, TPH-g, TPH-d). <br /> 09/21/93 Work plan for installation of monitoring wells. <br /> 11/18/93 MW1, MW2, MW3 installed. <br /> 12/20/93 Phase 11 Site Characterization report of monitoring well installation. <br /> Groundwater contamination evidenced in all 3 wells. <br /> 09/06/94 Phase 11 Remedial Work Plan - 7 soil borings, 4 of the borings to be <br /> completed as monitoring wells. <br /> 11122194 MW 4 installed. Borings B5 and B6 hand augered to 10 feet deep. <br /> 12/21/94 MW5, MW6 and MW7 installed. <br /> 02/23/95 Phase II Site Characterization - Continued report of monitoring <br /> wells 4, 5, 6, 7 installation and 85 and B6 information. <br /> 02/05/96 On site abandoned drinking water well destruction completed. <br /> 02/26/97 Receptor Survey report -wells within 2000 feet of site identified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.