My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
365
>
3500 - Local Oversight Program
>
PR0545431
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:15:11 PM
Creation date
3/9/2020 11:52:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545431
PE
3528
FACILITY_ID
FA0005191
FACILITY_NAME
FULLER MOBILE HOME PARK
STREET_NUMBER
365
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627022
CURRENT_STATUS
02
SITE_LOCATION
365 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L H <br /> WF Environmental Consultants, Inc. <br /> L <br /> Health & Safety Plan for Fuller Mobile Home Park, <br /> (` Lathrop,,California <br /> 1.0 Health and Safety Plan <br /> WHF Environmental Consultants, Inc. has adopted the following health and safety procedures for <br /> working with organic vapors and liquid contaminants encountered during drilling and excavation <br /> of subsurface soil. The purpose of this programi lis to provide health and safety precautions for the <br /> initial and subsequent site visits until the nature and magnitude of the contaminants have been <br /> defined. <br /> 1.1 Personnel Responsibilities <br /> All personnel assigned or involved with the remedial investigation or site clean-ups will <br /> have an assigned responsibility. The outlined responsibilities will establish standards for <br /> personnel protective wear, safety procedures and provide for emergency actions which <br /> could arise during project operations. <br /> 1.2 Project Manager (PAI) <br /> L <br /> The Project Manager directs all project operations. Project Manager (PM), in cooperation <br /> with the Project Safety Officer (PSO) has the primary responsibility for ensuring that the <br /> safety plan is read, signed, and fully understood by all employees and outside persons <br /> allowed around or within designated working perimeters of the job site. <br /> In cooperation with the PSO, he is responsible for ensuring that at all times during project <br /> operations, all employees adhere strictly to the Health and Safety Plan. <br /> 1.3 Project Safety Officer(PSD) il: <br /> The PSO shall direct and ensure that all employees comply with the Health and Safety <br /> Plan. The PSO has the primary responsibility for: <br /> L1. Assuring that appropriate personel protective equipment is available and properly <br /> utilized by all on-site personnel. <br /> 2. Assuring that personnel are aware of the provisions of this plan, are instructed in <br /> the work practices necessary to ensure safety, and in planned procedures for <br /> Ldealing with emergencies. <br /> — - ---.— <br />
The URL can be used to link to this page
Your browser does not support the video tag.