My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004904
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
365
>
3500 - Local Oversight Program
>
PR0545431
>
ARCHIVED REPORTS_XR0004904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:52:18 PM
Creation date
3/9/2020 11:59:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004904
RECORD_ID
PR0545431
PE
3528
FACILITY_ID
FA0005191
FACILITY_NAME
FULLER MOBILE HOME PARK
STREET_NUMBER
365
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627022
CURRENT_STATUS
02
SITE_LOCATION
365 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1VHFTNVIRONTMENTAL CONSULTANTS, INC. <br /> Health & Safety Plan <br /> i <br /> 1.0 HEA LTH AND SAFETY PLAN <br /> i BVI-IF Erivironmental Consultants, Inc , has adopted the following heal--h a�d safet <br /> p g Y <br /> procedures foi working with orgari,_ vapors anti liquid contaminants encounteied <br /> iduring drilling and excavation of subsurface soil The purpose of this program is to <br /> provide health and safety precautions for the initial and subsequent site visits until the <br /> inature and magnitude of the contaminants have been defined <br /> 1.1 Personnel Respnnsibilmes <br /> All personnel assigned or it-,olved with the remedial 2nx t.stngaticln or sits. Clean <br /> ups will have an assigned responsibility The outlined responsibili ties will "t"- <br /> blish stanaards for personnel protective wear, safety procedures and piovide for <br /> emergency actions which could arise during project operations <br /> 12 Project Manager (PM) <br /> 'fele Project Manager directs all project opeiarion5 Project IN'lanavei (.E M), In <br /> cooperation with the Project Safety Officei (PSO), has the piiinaiy iespo-1y'1- <br /> bility for ensuring that :he safety plan is read, signed, and fuhy understood by <br /> all employees and outside persons allowed around or within designated workmg <br /> perimeters of the job site <br /> In cooperation with the PSO, he is responsible for ensuring that at all times <br /> during project operations, all employees adhere strictly to the Health and Safety <br /> Plan <br /> 13 Project Safety Officer (IIS-) <br /> The PSO shall direct and ensure inat all employees con-.ply Nk ia, (lie Hl:;al:h and <br /> Safety Pian The PSO has the primary responsibility for <br /> 1 Assuring that appropriate personnel protective equipment is available and <br /> properly utilized by all on-site personnel <br />
The URL can be used to link to this page
Your browser does not support the video tag.