Laserfiche WebLink
WHF Environmental Consultants, Inc. <br />' Health & Safety Plan for Fuller Mobile Home Park <br /> • Page: S <br /> 3.0 Emergency Contingency Plan <br />' Should an situation or unplanned occurrence require outside or support services, the appropriate <br /> Y P <br /> contacts from the following list should be made <br /> • Project Manager <br />' A Client Project Coordinator <br /> • Police/Sheriffs Department <br />' • Ambulance <br /> • Hospital <br />' 3.1 Emergency Conditions <br /> In the event an emergency develops on-site, the procedures delineated herein are to be <br /> unmediately followed Emergency conditions are considered to exist if <br /> • Any member of the project are is involved in an accident or experiences any <br /> adverse effects of symptoms of exposure while on site <br /> • A condition is discovered that suggests the existence of a situation more hazardous <br /> than anticipated <br /> 3.2 Emergency Procedures <br /> In the even of an emergency, the following emergency procedures should be followed <br />' Personnel on-site should use the "buddy" system (pairs) Buddies should prearrange hand <br /> signals or other mean of communication In emergencies the following hand signals are <br /> suggested <br /> ♦ Hand gnpping throat Out of air, can't breathe <br /> ♦ Grip partner's wrist or place both hands around waist Leave area immediately, no <br /> debate[ <br /> ♦ Hands on top of head Need assistance <br /> Thumbs up OK, I'm all right, I understand <br /> ♦ Thumbs down No, negative <br /> Site work areas entrance and exit routes will be planned and emergency escape routes <br /> delineated by the Project Manager These routes will be shown to all on-site personnel by <br /> the SSO <br />