My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013099
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
365
>
3500 - Local Oversight Program
>
PR0545431
>
ARCHIVED REPORTS_XR0013099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 3:34:48 PM
Creation date
3/9/2020 1:05:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013099
RECORD_ID
PR0545431
PE
3528
FACILITY_ID
FA0005191
FACILITY_NAME
FULLER MOBILE HOME PARK
STREET_NUMBER
365
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627022
CURRENT_STATUS
02
SITE_LOCATION
365 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lkw� �-j <br /> WHFEnvironmental Consultants, Inc. <br /> Health & Safety Plan far Fuller Mobile Home Park <br /> Page: 7 <br /> When leaving the contaminated are, all personnel will decontaminate at the <br /> decontamination station. Decontamination will consist of the following basic steps <br /> moving from the contaminated are to the support area: <br /> Step 1 Wash and rinse boots in a two stage wash, remove and stack to dry. <br /> Step 2 Wash, rinse, and remove outer gloves, stack to dry. <br /> Step 3 Remove hard hat, wash, rinse, stack to dry. <br /> Step 4 If wearing PVC suit, wash, rinse, hang to dry. <br /> LStep 5 Remove Tyvek or Saranex suit, discard in waste container. <br /> Step 6 Remove respirator, wash, rinse, stack to dry in on break. <br /> Step 7 Proceed to decontamination trailer to wash hands, face, and neck if on <br /> break or shower at the end of the shift. <br /> Step 8 At end of shift, wash respirator thoroughly in wash solution, germicidal <br /> rinse, clean rinse, and hang to dry. <br /> L4.2 Equipment Decontamination <br /> All equipment must be thoroughly washed, rinsed, and certified decontaminated before <br /> r leaving the site. A decontamination station consisting of a vinyl catch basin and waste <br /> L collection system shall be established in the contamination reduction zone. All visible <br /> contamination dust and residue shall be removed from all equipment. <br /> 4.3 Personnel Decontamination Station Closure <br /> All disposable clothing and plastic sheeting used during the operation will be double <br /> bagged and either containerized on-site if determined non-hazardous or removed to an <br /> approved disposal facility if hazardous. Reusable rubber clothing will be dried and <br /> prepared for fixture use (if gross contamination has occurred, additional decontamination <br /> may be required). Cloth items will be bagged and removed from the site for final cleaning. <br /> All wash tubs, pail containers, etc., will be thoroughly washed, rinsed, and dried prior to <br /> removal from the site. <br /> L <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.