Laserfiche WebLink
Fuller Mobile Home Park <br /> 365 E. Louise Ave-, Lathrop, California June 5, 1496 <br /> Phase III Site Remediation Feasibility Study Work Plan Page: 5 <br /> 3.3.4 In Situ Natural Bio-Degradation <br /> Before natural bio-degradation can be considered as a remedial <br /> technique, soil and groundwater samples will need to be taken every 30 <br /> days for a 90 day period and analyzed for biological plate counts and <br /> BTEX, TPH-Gasoline and TPH-Diesel. <br /> It must be demonstrated that natural bio-degradation is progressing at a <br /> rate that will allow calculations of a projected time interval for site <br /> cleanup. <br /> LThis technique is the most cost effective, and in light of the recent <br /> Lawrence Livermore Report, probably the most logical approach to this <br /> low contamination level site. <br /> Upon receipt of your directive to proceed, W U shall obtain the necessary permits and <br /> schedule the boring and pump test. As usual, your office shall be notified 48 hours in advance <br /> Lof any field work. <br /> L <br /> L <br /> L <br /> L- <br /> L <br />