Laserfiche WebLink
enviros® <br /> borings. These samples will be collected, labeled, entered onto a chain-of-custody record, <br /> and preserved in a cooler with ice for transport to a State of California certified laboratory. <br /> An exploratory boring log will be prepared for each boring. Head-space vapor <br /> measurements will be recorded on the log. Standard drilling procedures are presented in <br /> Appendix A. <br /> Task 5 - Chemical Analysis <br /> Soil and groundwater samples will be analyzed for TPH-G according to EPA Method 8015 <br /> (Modified) and BTEX according to EPA Method 8020. <br /> Task 6 - Report Preparation <br /> Following the receipt of chemical analytical results from the Iaboratory, Enviros will <br /> prepare a written report describing field procedures, laboratory results, boring logs, and <br /> presenting conclusions and recommendations. <br /> The scope of work described in this work plan will be performed under the supervision of <br /> a registered professional engineer. <br /> Schedule <br /> Enviros is prepared to begin work upon approval of this work plan by SJCPHS and receipt <br /> of appropriate permits. <br /> If you have any questions regarding the scope of work outlined in this work plan, please <br /> call. <br /> Sincerely, <br /> Enviros, Inc. <br /> Mee y <br /> Project Geologist �oQ�gfE551pyq� <br /> Diane M. Lundqu' t, P.E. a �' <br /> Senior Engineer tj N4. C46725 <br /> C46725 P C1W. �`� <br /> ATE OF CAOF <br /> Attachments: <br /> Plate 1 - Vicinity Map <br /> Plate 2 - Site Plan/Area of Proposed Investigation <br /> Appendix A -Field Methods and Procedures <br /> cc: Mr. R. Jeff Granberry, Shell Oil Products Company <br /> Ms. Elizabeth Thayer, Central Valley Regional Water Quality Control Board <br /> 96377 3 <br />