My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
7910
>
3500 - Local Oversight Program
>
PR0545441
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 6:21:27 PM
Creation date
3/9/2020 2:39:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545441
PE
3528
FACILITY_ID
FA0003733
FACILITY_NAME
NORTH SIDE SHELL
STREET_NUMBER
7910
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
07949006
CURRENT_STATUS
02
SITE_LOCATION
7910 LOWER SACRAMENTO RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and duplicates on all analyses, will be provided if requested. <br /> 6.0 SITE SAFETY PLAN <br /> This plan addresses safety provisions to be employed during the.Site investigative,'field work at the <br /> Lower Sacramento Road Shell. The objective of the plan is to,describe procedures and tactions to <br /> protect the worker, as well as uninvolved parties, from inhalation and ingestion of; and :direct skin <br /> contact with,'potentiaily hazardous materials that maybe encountered'at the Site. The plan describes 1) <br /> personnel responsibilities, and 2) protective equipment to be worn as appropriate when working on the <br /> Site. <br /> f.n <br /> r ; <br /> i 6.1 Personnel Responsibilities <br /> i <br /> Key personnel directly involved in the investigation who will be responsible for monitoring he execu- <br /> tion of safe work practices and the provisions of this plan are 1) the drilling subcontractor rproject <br /> supervisor and 2) the Delta project field manager. These personnel' are responsible for knowing the <br /> provisions of,the plan, communicating plan requirements to workers under their supervisionand to Site <br /> visitors, and for enforcing the plan. E, <br /> 6.2 Personnel Protection <br /> - i <br /> The designated personnel protective equipment is selected to prevent field personnel'from exposure to <br /> gasoline fuel products that may be present at the Site. .To prevent direct skin contact, the{ following <br /> protective clothing will be worn as appropriate while working at the Site: Y <br /> i. <br /> . a. <br /> j, <br /> of the Site except in designated areas. No contact lenses will be worn by field personnel. .`. <br /> — 7.0 SCHEDULE < <br /> Delta proposes to begin work described herein as soon as approval is obtained. <br /> S <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.