Laserfiche WebLink
EQUIVA WELL MONITORING ITORING DATA SKEET <br /> Project # q go Z ? _ Z Job # Z O L(— 5 2 q— 0 yo l <br /> Sampler- Date 19 — 2 — ! y <br /> Well I D R6v_ 2 well Diameter- 2 3 C4D 6 8 <br /> Total Well Depth 27. 2� IDepth to Water- 3 <br /> Depth to Free Product Thickness of Free Product (feet) <br /> Referenced to V Grade D 4 Meter (1f req'd) Ysl HACH <br /> Well Diameter MultmIler Well_Dlameter Multiplier <br /> Z" 0 16 5" 1 02 <br /> 3" 037 6" 147 <br /> 4" 065 Other radius'"0 163 <br /> Purge Method Bailer Sampling MethodBailer <br /> Middleburg Extraction Port <br /> is;u�bme�rsi�taer—�--� Other <br /> Extra <br /> Other <br /> ZO . e, X = / Gals <br /> I Case Volume(Gals ) Specified Volumes Calculated Volume <br /> Time Temp (°F) pH Cond Turbidity Gals Removed Observations <br /> /Z.10� �3-/ //Zo 2cb 2-o• S Z! 60 S' 7.0 / 6!?6 zoo / <br /> z.6 .6C) Fz ZZs GZ <br /> Did well dewater? Yes No Gallons actually evacuated Z- <br /> Sampiing Time. 129 r Sampling Date 2 <br /> Sample I.D . &j,Z Laboratory Sequoia BC Other <br /> Analyzed for- PH-G BTEX MTBE TPH-D Other <br /> D G (if req'd)- Pre-purge' mg/L Post-purge mg/L <br /> 0 R.P (if req'd). Pre-purge mV Post-purge m <br />