Laserfiche WebLink
SHEL'PWELL MONITORING DAT ET <br /> Project #: J �SZ � Z WIC #: -7-5-Z-4'- D 0 <br /> M1 Ar& <br /> Sampler. <br /> Date: j!2-1 !q <br /> Well I.D.: tAV J- Z Well Diameter: 2 3 6 8 <br /> Total Well Depth: Depth to Water- 5_0 <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: Grade D.O. Meter (if req'd): YSI HACH <br /> Well Diameter Muffigher Wel?Diameter �ulttniier <br /> 2" 016 5" 102 <br /> 3" 037 6" 147 <br /> 4" 065 Other rad=2*0 I63 <br /> r <br /> Purge Method Bailer Sampling Method BatlerX <br /> Middleburg Extraction Port <br /> Electric Submersibles Other- <br /> Extraction Pump <br /> ther2Other- <br /> 2- 1 , <br /> 1 < X = SCJ �Gais <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> Time Temp (°F) pH Cond. Turbidity Gals Removed Observations <br /> Izso c) , 4c( ., -2-*Z, <br /> 1223 0< � 1 <br /> ) 236 1170e <br /> Did well dewater? Yes o Gallons actually evacuated: 6_t�- <br /> Sampling Time: l 2.4--o Sampling Date: Z `! E5 <br /> Sample LD.: W - 2— Laboratory. equoia Crosby <br /> Analyzed for: T(0E TPH-D Other- <br /> Equipment Blank I.D.: @ r=a Duplicate I D <br /> Analyzed for: TPH-G BTEx MTBE TPH-D Other: <br /> D O. (if req'd): Pre-purge. U9/ Post-purge1 <br />