Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> On-site communications: ❑ Radio x Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio ® Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: Tobe determined on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP ❑ CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure:. All contaminated personal protective eauipment (i.e., <br /> gloves, coveralls) will be placed on and covered with 6- <br /> mil plastic sheeting along with the drill cuttings. <br /> Location of Wash Water: Site Building <br /> Location of Toilet: Site Building <br /> Location of Drinking Water: Site Building <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP ❑ CHECK WHENDONE <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br /> site until appropriate disposal methods are <br /> determined. <br /> PAGE 8 <br />