My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAGNOLIA
>
510
>
3500 - Local Oversight Program
>
PR0545481
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 9:00:17 AM
Creation date
3/10/2020 8:38:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545481
PE
3528
FACILITY_ID
FA0004023
FACILITY_NAME
CA STATE UNIVERSITY STANISLAUS*
STREET_NUMBER
510
Direction
E
STREET_NAME
MAGNOLIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
510 E MAGNOLIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> F <br /> 4 <br /> R <br /> y.r <br /> 12.0 MEDICAL SURVEILLANCE PROGRAM <br /> Prior to assignment to any task requiring a level of personnel protection above level D, personnel <br /> will submit, if required by the Tetra Tech.project manager, evidence that they have received and <br /> have .passed a physical examination within the previous twelve months which incorporates the <br /> following: <br /> • An occupational and general physical history. <br /> • Complete physical examination which incorporates the head, torso, abdomen , limbs, and . <br /> musculo-skeletal systems. <br /> • Chest X-ray <br /> • Pulmonary function test. <br /> • Audiometric exam.for persons working around drill rigs. <br /> • Laboratory testing of blood and urine to include the following: C.B.C., albunim phosphatase, <br /> total bilirubin, SGOT, SGPT, cholesterol, total protein, albumin, globulin,-A/G ratio, BUN, <br /> and creatinine <br /> • Vision test. <br /> • Electrocardiogram <br /> 12.1 HEAT STRESS MONITORING <br /> To aid in the prevention of heat stress, the following will provided for personnel working at the <br /> site, if required: <br /> • Potable Water <br /> Fresh water <br /> Potable water with 1% salt or commercial mix (such as gatorade) will be within <br /> easy access to all workers.' <br /> I <br /> L <br /> TETRA TECH: HEALTH AND SAFETY PLAN PAGE 20 <br /> G <br />
The URL can be used to link to this page
Your browser does not support the video tag.