My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAGNOLIA
>
510
>
3500 - Local Oversight Program
>
PR0545481
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 9:00:17 AM
Creation date
3/10/2020 8:38:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545481
PE
3528
FACILITY_ID
FA0004023
FACILITY_NAME
CA STATE UNIVERSITY STANISLAUS*
STREET_NUMBER
510
Direction
E
STREET_NAME
MAGNOLIA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
02
SITE_LOCATION
510 E MAGNOLIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> Equipment used for sampling which is in direct contact with the soil media, will undergo a more <br /> stringent decontamination process: The procedures are as follows: <br /> LBrush off loose dirt-with a steel-bristle'brush in the decontamination area; <br /> • Equipment is washed in Tri-Sodium Phosphate (TSP)'detergent solution using plastic <br /> scrub brushes; <br /> • Following the detergent wash,.equipment is rinsed with tap water; and <br /> • As a final step, equipment is rinsed with distilled water and allowed'to air dry. <br /> • The clean equipment is then transfred to the clean zone. <br /> • Decontamination solutions are transferred to 55-gallon drums for storage prior to <br /> disposal. <br /> BOREHOLE ABANDONMENT . <br /> All borings will be abandoned by backfilling with bentonite chips or a concrete-bentonite slurry. <br /> The backfill materials are poured down the.hollow-stem auger and the augers removed in five <br /> foot increments. The down-hole hammer is used to insure that there is no bridging of the backfill <br /> materials. For bentonite chips, a small amount of tap (potable) water is.added down the augers as <br /> each five foot .flight is removed'.to hydrate the bentonite and form a seal against contaminant <br /> migration. This process will continue until the borehole is filled to within one foot of the ground <br /> surface, then capped with concrete to.the ground surface. <br /> PROJECT DOCUMENTATION <br /> Lt Documentation of each step in the drilling and sample e collection procedure is essential to track <br /> and evaluate the validity and quality of the data that is generated. The following forms are used <br /> to document the investigation program: <br /> • Soil boring log; <br /> • Sample chain of custody form; <br /> • Daily field work log, and; <br /> • Drum inventory form. <br /> C' <br /> These forms contain much of the same information and are filled out by different members of the <br /> sampling crew, therefore; allowing.a cross check of the sampling location numbers,.sampling <br /> depths, sample numbers and analyses requested per sample. <br /> i..l C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.