My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004600
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
151
>
3500 - Local Oversight Program
>
PR0545482
>
ARCHIVED REPORTS_XR0004600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 11:53:03 AM
Creation date
3/10/2020 8:54:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004600
RECORD_ID
PR0545482
PE
3528
FACILITY_ID
FA0005075
FACILITY_NAME
DONS MOBILE GLASS
STREET_NUMBER
151
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
953365719
APN
21941015
CURRENT_STATUS
02
SITE_LOCATION
151 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrective Action Plan <br /> Major System Components: <br /> Four SVE/Groundwater Extraction Wells <br /> ' Four 5-gpm Electric Turbine Groundwater Pumps <br /> Double-Contained Groundwater Transport Piping <br /> ' One Particle Filter <br /> Two 1,000-1b. Aqueous-Phase GAC Canisters <br /> ' The design capacity of the groundwater extraction/treatment will be 15 gpm for normal operation; <br /> however, easy, inexpensive modification (larger capacity turbine pumps) can accommodate <br /> production of up to 35 gpm. <br /> 5.4 Dual-Phase SVE and Groundwater Treatment System <br /> Both the soil vapor and groundwater treatment systems will be fabricated in OST's proprietary <br /> ' Mobile Interchangeable Treatment System (MITS) configuration delivered to the site read for <br /> g Y <br /> hook-up and operation. The system is fully housed in a secure metal container with dimensions <br /> of 8' x 20' x 8', generally requiring no concrete pad or footings for its installation. The container <br /> is double-lined for noise abatement, and double-containment under the aqueous-phase GAC is <br /> ' provided to contain accidental discharge of water. All soil vapor and groundwater transport <br /> piping and utilities will converge at and emanate from the NUTS unit's standard connection port <br /> (SCP). The dual-phase treatment system and connecting piping will be located as illustrated on <br /> Figure 5. A flow diagram showing the major dual treatment system components is presented on <br /> Figure 6. <br /> ' 6.0 PROPOSED CLEANUP GOALS <br /> Except for the excessive concentrations of TPHg and benzene, the site meets many of the criteria <br /> of a low-risk groundwater case. The actual cleanup standard for fuel leak cases have been <br /> evolving over the past two years since the Lawrence Livermore National Laboratory <br /> ' recommendations concerning UST leak sites were promulgated. OST anticipates reductions of <br /> TPHg and benzene of 95 percent or more will be achieved by the proposed remediation program. <br /> 1 <br /> 1 <br /> ' OST <br /> 70I-1-2.cap Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.